Laserfiche WebLink
O &M DESCRIPTION (Based on a 50 <br />UNIT <br />QUANTITY <br />UNIT <br />TOTAL <br />WORK <br />REPLACE <br />50 -YEAR <br />Year Project Life) <br />PRICE <br />UNIT <br />INTERVAL <br />INTERVAL <br />COST <br />COST <br />Scuba Gear for Silt & Vegetation Removal <br />Ea <br />4 <br />$1 OOOIEa <br />$4000 <br />Every 10 years <br />5 times <br />$20,000 <br />Scythes for Vegetation Removal <br />Ea <br />4 <br />$25/Ea <br />$100 <br />Every 3 years <br />17 times <br />$1700 <br />In- Stream Silt Removal 3 people) <br />Hr <br />480 <br />$100 /Hr <br />$48,000 <br />Every year <br />50 times <br />$2',400,000 <br />In- Stream Ve etation Removal 2 people) <br />Hr <br />200 <br />$20 /Hr <br />$4000 <br />Every year <br />50 times <br />$200,000 <br />In- Stream Silt Disposal <br />Job <br />1 <br />$200/Job <br />$200 <br />Every year <br />50 times <br />$10,000 <br />In- Stream Vegetation Disposal <br />Job <br />1 <br />$200/Job <br />$200 <br />Every year <br />50 times <br />$10,000 <br />Vacuum Truck Maintenance <br />Hr <br />104 <br />$10 /Hr <br />$1040 <br />Every year <br />50 times <br />$52,000 <br />Bank Stabilization <br />Job <br />1 <br />$100 /Job <br />$100 <br />Ever ear <br />50 times <br />$5000 <br />Grassland Area Mowing <br />Hr <br />8 <br />$10 /Hr <br />$80 <br />Every 3 years <br />17 times <br />$1360 <br />Terrestrial Exotic Vegetation Removal <br />Hr <br />80 <br />$10 /Hr <br />$800 <br />Every year <br />50 times <br />$40,000 <br />Care of Terrestrial Vegetation <br />Hr <br />624 <br />$1 OIHr <br />$6240 <br />First 2 years <br />2 times <br />$12,480 <br />Care of Aquatic Ve etation <br />Hr <br />208 <br />$10 /Hr <br />$2080 <br />First 2 ears <br />2 times <br />$4160 <br />Care of Water Control Structures <br />Hr <br />104 <br />$101Hr <br />$1040 <br />Evea year <br />50 times <br />$52,000 <br />Care of Duck Boxes <br />Hr <br />16 <br />$101Hr <br />$160 <br />Every year <br />50 times <br />$8000 <br />Wetland Silt Removal 3 people) <br />Hr <br />200 <br />$30/Hr <br />$6000 <br />Every 5 years <br />10 times <br />$602000 <br />Wetland Silt Dis osal <br />Job <br />1 <br />$200/Job <br />$200 <br />Every 5 years <br />10 times <br />$2,000 <br />Retention Basin Silt Removal 3 people) <br />Hr <br />100 <br />$30/Hr <br />$3000 <br />Ever 2 ears <br />25 times <br />$75,000 <br />Retention Basin Silt Disposal <br />Job <br />1 <br />$200/Job <br />$200 <br />Eve 2 ears <br />25 times <br />$5,000 <br />TOTAL <br />$599174 <br />Total In -stream Costs Construction + 0.815% of CSFP $2,981,585 <br />Total Prairie Costs Construction + 0.015% of CSFP $54,981 <br />Total Riparian Costs Construction + 0.060% of CSFP $219,633 <br />Total Wetland Costs Construction + 0.110% of CSFP $402,952 <br />Total Restoration Costs $396589791 <br />