Laserfiche WebLink
Attachment 2 <br />City of San Marcos <br />FM 110 Connection Drive <br />Design, Bid and Construction Phase <br />FEE SUMMARY <br />Service <br />Estimated Fees <br />Design Phase (60%, 90%, 100%) $ 55,134.00 (includes ODEs) <br />Total Design Phase Fee <br />$ 55,134.00 <br />Supplemental Services <br />Estimated Fees <br />Bid Phase <br />$ <br />19,670.00 <br />Construction Phase <br />$ <br />50,232.00 <br />Record Drawings <br />$ <br />11,350.00 <br />Geotechnical Investigation (Sub - Kleinfelder) <br />$ <br />17,400.00 <br />Record Dwg Survey (Sub - Byrn) <br />$ <br />6,950.00 <br />Travel Cost <br />$ <br />930.00 <br />Total Fee (includes Design Phase) <br />$ <br />161,666.00 <br />(includes ODEs) <br />(includes ODEs) <br />