Laserfiche WebLink
Attachment 2 <br />City of San Marcos <br />FM 110 Connection Drive - Historic Air Tower Relocation <br />Design, Bid and Construction Phase <br />WORK TASK DESCRIPTION <br />E-6 <br />E-5 <br />E4 <br />E-3 <br />E-2 <br />E-1 <br />T-2 <br />AM-2 <br />$344.00 <br />$280.00 <br />$230.00 <br />$197.00 <br />$163.00 <br />$141.00 <br />$130.00 <br />$109.00 <br />hr <br />hr <br />hr <br />hr <br />hr <br />hr <br />hr <br />hr <br />Design Phase Updates <br />1 Project Management <br />Project Admin and Coordination <br />8 <br />Monthly Progress Report and Invoicing <br />4 <br />1 <br />1 <br />1 <br />4 <br />Quality Control Review <br />6 <br />12 <br />2 Meetings <br />Project Meetings (2) <br />2 <br />2 <br />2 <br />3 Design Phase - Tasks <br />A. Roadway Design <br />Update model/grading for roundabout <br />8 <br />4 Design Phase - Plan Development <br />A. Revised Final100% Drawings <br />Update Index of Sheets <br />1 <br />2 <br />Update General Notes Sheet <br />1 <br />1 <br />Update Project Layout Sheet <br />1 <br />Update Summary/Quantity <br />2 <br />8 <br />4 <br />Update Typical Sections <br />2 <br />2 <br />Update Traffic Control Plan Narrative and Phasing Sheets <br />2 <br />2 <br />4 <br />Update Roadway Plan and Profile Sheets <br />4 <br />8 <br />Update Signing Sheets <br />1 <br />2 <br />Update Pavement Marking Sheets <br />2 <br />Update SW3P Narrative and SW3P sheets <br />1 <br />2 <br />Update Project Specific/Special Specifications <br />1 <br />2 <br />Update Construction Project Schedule <br />2 <br />8 <br />Update Engineer's Opinion of Probable Construction Cost <br />1 <br />2 <br />4 <br />Review City's comments and develop Comment Responses <br />1 <br />2 <br />Update Bid Form/Bid Schedule <br />2 <br />Update GIS Submittal Checklist <br />1 <br />2 <br />B. Historical Air Traffic Control Tower Relocation <br />Design Team Coordination Meetings <br />12 <br />8 <br />8 <br />Develop Existing Structure 3D Scan <br />16 <br />Structural Foundation Design <br />2 <br />8 <br />16 <br />Develop Structural Foundation Drawings <br />2 <br />8 <br />40 <br />Develop Recommendations for Repair of Existing Structure <br />4 <br />Develop Recommendations for Tower Disassembly & <br />Relocation <br />I <br />4 <br />Lighting and Power Design for Relocated Beacon Tower <br />4 <br />12 <br />8 <br />New Electrical Service Coordination <br />4 <br />8 <br />Tabulation of Quantities/Estimation of Tower Relocation Efforts <br />2 <br />Subtotal - Design Phase Updates <br />23 <br />54 <br />1 0 <br />54 <br />s0 <br />1 40 <br />6 <br />MANHOUR FEE SUBTOTALS <br />SUBTOTALS <br />267 $ 54,634.00 <br />