Res 2026-002 approving a Change in Service to the Agreement with Garver LLC, to provide engineering design, bid and construction phase services for the FM-110 Connection Drive Project in the amount of $161,666.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-002 approving a Change in Service to the Agreement with Garver LLC, to provide engineering design, bid and construction phase services for the FM-110 Connection Drive Project in the amount of $161,666.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2026 11:06:23 AM
Creation date
1/30/2026 2:42:39 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-002
Date
1/20/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT 1 <br />CITY OF SAN MARCOS <br />FM 110 Connection Drive at San Marcos Airport <br />SCOPE OF SERVICES <br />Project Understanding <br />The work to be performed by Garver, LLC (Garver or the Consultant) under this contract will consist of <br />providing Design Phase (Revised 100% Documents to include historical air traffic control tower) Bid and <br />Construction Phase Services for the FM 110 Connection Drive at San Marcos Airport. The project <br />consists of the following improvements: <br />• General Description — Proposed roadway connection from future FM 110 to Airport Drive, <br />including a roundabout, drainage improvements and utility adjustments/relocations. <br />Basic Scope of Services <br />Design Phase (Revised 100%) <br />1. Project Management and QA/QC: This task consists of effort associated with project administration, <br />coordination with City staff, coordination and supervision of the project team, and quality <br />management so that project milestones and deliverables meet schedule and budget constraints. <br />2. Meetings <br />a. Project Coordination Meetings: Two (2) coordination/comment review meetings have <br />been budgeted for revisions to the 100% Design Phase. Garver will attend meetings with <br />City of San Marcos Staff to determine project constraints and needs as well as discuss <br />design considerations. <br />3. Tasks <br />a. Roadway Design: Consultant will update the 3D model and develop proposed terrain files <br />for selected contractor's use. <br />4. Deliverables: <br />a. Revised Final 100% Drawings: Consultant will provide one (1) unsealed DRAFT pdf <br />electronic copy and one (1) unsealed copy of specifications. Upon approval by the City, <br />one (1) pdf copy and one (1) CAD copy of the sealed plans and sealed copy of <br />specifications will be provided. The following items are to be updated: <br />Index of sheets <br />ii. General Notes <br />iii. Project Layout <br />iv. Summary of Quantities <br />V. Typical Sections <br />vi. Traffic Control Plan Sheets <br />vii. Roadway Plan and Profile Sheets <br />