My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-002 approving a Change in Service to the Agreement with Garver LLC, to provide engineering design, bid and construction phase services for the FM-110 Connection Drive Project in the amount of $161,666.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-002 approving a Change in Service to the Agreement with Garver LLC, to provide engineering design, bid and construction phase services for the FM-110 Connection Drive Project in the amount of $161,666.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2026 11:06:23 AM
Creation date
1/30/2026 2:42:39 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-002
Date
1/20/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT 1 <br />CITY OF SAN MARCOS <br />FM 110 Connection Drive at San Marcos Airport <br />SCOPE OF SERVICES <br />viii. Signing and Pavement Marking Layouts <br />ix. Erosion Control Sheets <br />1. SW3P Narrative and Plans <br />X. Project Specific/Special Specifications <br />xi. Construction Project Schedule <br />xii. Engineer's Opinion of Probable Construction Cost (OPCC) <br />xiii. GIS plan review checklist. Complete when providing CAD and pdf of 100% <br />design. <br />xiv. Bid Form: Consultant will provide the Bid Form in Excel format provided by city. <br />xv. Construction Check List: fill out checklist provided by city and return <br />b. Historical Air Traffic Control Tower Relocation: Consultant will incorporate the following <br />related to the relocation of the Historical Air Traffic Control Tower from its existing <br />location to the center of the proposed roundabout: <br />i. Internal design team coordination meetings <br />ii. Structural foundation design and drawings <br />iii. Develop recommendations for repair and restoration of existing structure <br />iv. Develop recommendations for tower disassembly & relocation <br />V. Develop lighting and power design and drawings for relocated beacon tower <br />vi. Coordinate new electrical service with service provider <br />vii. Tabulate quantities and develop OPCC for Historical Air Traffic Control Tower <br />relocation efforts. <br />Supplemental Scope of Services <br />Geotechnical Investigation will be performed by subconsultant (Kleinfelder). Scope of services includes: <br />• Conducting one (1) soil boring at the proposed tower relocation footprint with a depth of 65' <br />• Performing laboratory testing in conformance with ASTM standards <br />• Evaluating field and laboratory data to provide design recommendations for appropriate <br />foundation types <br />• Amending previous Geotechnical report to include recent findings and recommendations <br />Record drawing survey consisting of collecting above ground appurtenances including 3 hydrants, 3 <br />valves, and 18 storm sewer culverts will be performed by subconsultant (Byrn & Associates Inc.). <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.