Laserfiche WebLink
Docusign Envelope ID: 2F654578-C37A-44A0-A108-8F69400F3C73 <br />OWNER -CONTRACTOR AGREEMENT <br />Lift Station 24 Upgrades IFB #2025-122 <br />STATE OF TEXAS <br />COUNTY OF HAYS <br />This Agreement (this "Agreement") is entered into by and between The City of San Marcos, a <br />municipality in the State of Texas ("Owner"), and Arguijo Corporation, 3316 Bee Cave Road, Ste C, <br />West Lake Hills, TX 78746, ("Contractor"), and is effective for all purposes as of the date of the last <br />signature to this Agreement ("Effective Date"). <br />Section 1. The Contractor agrees to commence, carry out, and complete all work for the <br />construction of the Project for the Contract Amount of one million, sixteen thousand, seven hundred <br />and ten dollars and 14/100s ($1,016,710.14) and within the Contract Time, in accordance with the <br />Contract Documents. <br />Section 2. The Owner agrees to pay the Contractor for the satisfactory performance of the Contract <br />in accordance with the amount agreed to herein for all Work in accordance with the Bidding and Contract <br />Documents, Project Manual, Drawings, and Addenda, which are incorporated herein by reference and <br />described in Article 2 of the General Conditions which constitute the Contract between the Owner and the <br />Contractor. Any unit prices contained in the Bid Form will apply to this Contract in case of subsequent <br />quantity adjustments for work items. <br />Section 3. The Contractor agrees to commence work by the project start date set in the Notice to <br />Proceed, to finally complete and achieve final acceptance of the Project within the number of days <br />specified in the Project Schedule on PS-1 which is incorporated by reference into this Owner -Contractor <br />Agreement, subject to extensions of time as provided in the Contract Documents. Time is of the essence <br />of this Agreement, and the Contractor acknowledges that the Owner will be damaged if the Contractor <br />fails to complete the Project on time and in accordance with the Contract Documents. The Contractor <br />agrees to ensure that workers' compensation insurance coverage will be provided for all persons employed <br />on the Project. <br />Section 4. The Contractor makes the following representations in order to enter into this <br />Agreement with the Owner: <br />a) The Contractor has examined, read, and understands the Contract Documents; <br />b) The Contractor is familiar with the Project area and site, and all local, state, and federal laws <br />and regulations that in any manner may affect cost, progress, or performance of the work; <br />c) The Contractor has made and studied the results of examinations, investigations, and tests of <br />subsurface and latent physical conditions which may affect the cost, progress, or performance of the work <br />that the Contractor considers necessary to assure construction of the Project at the contract price within <br />the contract time and in accordance with the Contract Documents, and no additional examinations, <br />investigations, tests, reports, or other similar information will be required by the bidder for these purposes; <br />d) The Contractor has reviewed all information in the Contract Documents with respect to existing <br />underground facilities at or near the Project site, and the Contractor assumes responsibility for the exact <br />nature and location of these underground facilities; and no additional examinations, investigations, tests, <br />reports, or similar information will be required by the Contractor in order to construct the Project at the <br />contract price within the contract time and in accordance with the Contract Documents, including Section <br />3.04 of the General Conditions; <br />Rev 08.17.2022 OC-1 <br />