My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2003-155
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2003
>
Res 2003-155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2004 2:18:22 PM
Creation date
2/20/2004 3:05:56 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2003-155
Date
9/8/2003
Volume Book
153
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Scope of Work <br /> <br />1. <br /> <br />Description: This item shall govern for the cutting of vegetation and the removal <br />of debris in selected right-of-ways, alleyways, creeks and other open waterways <br />in conformance with the details as shown on the plans provided by City staff. <br />Equipment: The following equipment will be the minimum that will be used in <br />the performance of the work. Walk-behind mowers, weed-eaters, chainsaws, <br />riding tractor with shredder, push mower, blowers ,and other hand tools as needed. <br />In the event larger equipment is needed, we will notify the appropriate City <br />personnel for approval. <br />Sequence of work: Work to cut vegetation in the right-of-ways, vacant land, <br />alleyways and a pond wì11 begin within thirty (30) days from the notice to <br />proceed. It is recommended that prior to the start .of work; the City and the <br />Contract Manager for Easter Seals meet and discuss scheduling priorities. <br />Depending on when the notice to proceed is given, work in the creeks mayor may <br />not begin within the 30 days. It is recommended that due to the nature of the soils <br />and ground water conditions currently in and around the creeks, it may be <br />preferable to postpone the first cut of these creeks until conditions are a little <br />dryer. However, should this prove to be a hardship for the City, work in these <br />areas will also begin within 30 days of notice to proceed. <br />Maintenance time limits: This proposal is for the cutting and/or removal of <br />vegetation and debris from right-of-ways, vacant land, alleyways and a pond on a <br />varying basis. <br />Cutting height: In those areas that require the use of a mower, the height of the <br />blades will be set at a maximum of 2-3 inches. For those areas requiring use of <br />weed-eaters, employees will strive to maintain a unifonn height of 4 inches. <br />However, due to the varying relief of the terrain, vegetation heights may be more <br />or less than 4 inches. <br />Measurements:111e information provided by the City to Easter Seals indicating <br />the location and sjze of each work site will be considered accurate and is the basis <br />for all associated prices. <br />Pricing: TIle following prices for area groups are based on a price per square foot <br />or man-hours worked. <br /> <br />2. <br /> <br />3 <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br /> TOTAL TOTAL TOTAL <br />AREAS CYCLES/YEAR PRICE/SQ.FT. PRICE SQ.FT. AC. <br />Creeks 3 $0.0150 $157,630 3,502.889 80 <br />Downtown 12 $0.0040 $8,458 176,208 4 <br />Alleyways/ROWs 4* $0.0035 $79,218 5,151,029 195 <br />Ball Fields 64 $30,000 <br />Flower Beds $11.50/man $24,000 <br /> hour <br /> TOTAL $299,306 12,168.764 279 <br /> <br />* Those areas that are near a school zone will be maintained 6 times this year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.