Laserfiche WebLink
City of San Marcos <br />Marlton Estates <br />ENGINEERS CONSTRUCTION COST ESTIMATE <br />WASTEWA I f=K IMF'KL)VtMtN 1 <br />B~RN~ <br />~ZWJ6~NJ/V~~'1~9 ~' <br />~V J~L 111Li1W l) L 11. ~ Li 1 ViVJ <br />IIlS HWY SO Ya11St', SAN T~',`RCOS TF.~AS 78667-3433 <br />PHt)NE SI2-39G-227C) EAX ~2-3~-2445 <br />ui,;Z6i G:: Ct~.51 i ~1 U:i-lc?~C,.;';,~JSI ESl-Ir.:;HiaiT-6.::LS <br />Date: May 23,2008 <br />BiD SPEC UNIT <br />ITEM ITEM DESCRIPTION UNIT QTY PRICE PRICE <br />NO. NO. <br /> MANHOLES, STANDARD (ALL DEPTHS), <br />30 506 INCLUDES CONCRETE COLLAR, FRAME AND EA 3 $3,400.00 $10,200.00 <br /> COVER <br />31 5095 TRENCH SAFETY ALL DEPTHS LF 620 $1.50 $930.00 <br />32 510 PIPE, SDR 26, 8" (0-6) LF 620 $32.00 $19,840.00 <br />33 510 PIPE, SDR 26, 6" (0-6) LF 48 $30.00 $1,440.00 <br />34 4' TRENCH PAVEMENT REPAIR SY 2 $150.00 $300.00 <br />35 510 6" SERVICE CONNECTION EA 11 $1,200.00 $13,200.00 <br />TOTAL WATER CONSTRUCTION COST: $45,910.00 <br />Byrn 8 Associates, Inc. does not warrant or guarantee this "cost estimate" as an "actual cost" and/or if an "actual Construction Cost' is <br />required, and/or desired then construction bids should be obtained from appropriate sources. This estimate is being supplied for the applicable <br />client only and no representations, warranties, or guarantees are rendered hereby to any other person or entity, <br />but not limited to, any mortgagor or lending institution. <br />