Laserfiche WebLink
City of San Marcos <br />Marlton Estates <br />ENGINEERS CONSTRUCTION COST ESTIMATE <br />WATER IMPROVEMENT <br />~/~-(~ (B~(~4~~R~NQ~ ~ <br />Ca1syF~W1.~11C11R 1GA)19 ~• <br />ENGINEERS SURVE~~RS <br />uts ~ ~o ~sT, s,~ ~~cos ~-s ~-ray ' <br />_ .. <br />U8i2b i._ ~ {;~_:S'f f-.~;'1 `i:: 1 ~!-GB Ci57 FS 1 _ iHl3!! -' :<:L:~ <br />Date: May 23,2008 <br />BID SPEC UNIT <br />ITEM ITEM DESCRIPTION UNIT QTY pRiCE PRICE <br />NO. NO. <br />50 509S TRENCH SAFETY ALL DEPTHS LF 131 $1.50 $196.50 <br />59 DUAL SERVICE CONNECTION EA 5 $1,850.00 $9,250.00 <br />52 SINGLE SERVICE CONNECTION EA 1 $1,750.00 $1,750.00 <br />53 510 1" TYPE K SOFT COPPER SERVICE LEAD LF 131 $2.00 $262.00 <br />TOTAL WATER CONSTRUCTION COST: $11,458.5 <br />Bym & Associates, Inc. does not warrant or guarantee this "cost estimate" as an "actual cost" and/or if an "actual Construction Cost" is <br />required, and/or desired then construction bids should be obtained from appropriate sources. This estimate is being supplied for the applicable <br />client only and no representations, warranties, or guarantees are rendered hereby to any other person or entity, <br />but not limited to, any mortgagor or lending institution. <br />