Laserfiche WebLink
City of San Marcos <br />Marlton Estates <br />ENGINEERS CONSTRUCTION COST ESTIMATE <br />WATER IMPROVEMENT <br />~~-~v (~/~(~V~~1I+Ip~v ~ <br />d"ilayil+~U~l.Jl~ll ~r•»y INQ•• <br />~'~rJ J~L ~~ 1~.J V li~l~~~ <br />~'~;`: <br />Date: May 23,2008 <br />BID SPEC UNIT <br />ITEM ITEM DESCRIPTION UNIT QTY PRICE <br />PRICE <br />NO. NO. <br />50 5095 TRENCH SAFETY ALL DEPTHS LF 131 $i.50 $198.50 <br />51 DUAL SERVICE CONNECTION EA 5 $3,850.00 $9,250.00 <br />52 SINGLE SERVICE CONNECTION EA 1 $1,750.00 $1,750.00 <br />53 510 1" TYPE K SOFT COPPER SERVICE LEAD LF 131 $2.00 $262.00 <br />TOTAL WATEE7 CONSTRUCTION COST: $11,458.50 <br />E3yrn & Associates, Inc. does not warrant or guarantee Phis "cast estimate" as an "actual cost" andfor it an "actual Construction Cost" is <br />required, and/or desired then consfruction bids should be obtained from appropriate sources. This estimate is being supplied for the applicable <br />client only and no representatrons, warranties, ar guarantees are rendored hereby to any other person or entity, <br />but not limited to. any mortgagor or lending institution.. <br />