Laserfiche WebLink
Gity of San Marcos <br />Marlton Estates <br />ENGINEERS CONSTRUCTION COST ESTIMATE <br />w <br /> <br />Date: May 23,2008 <br />BID SPEC UNIT <br />ITEM ITEM DESCRIPTION UNIT QTY PRICE PRICE <br />NO. NO. <br /> MANHOLES, STANDARD (ALL DEPTHS), <br />30 506 INCLUDES CONCRETE COLLAR. FRAME AND EA 3 $3,400.00 $10,200.00 <br /> COVER <br />31 509S TRENCH SAFETY ALL DEPTHS LF 620 $1.50 $930.00 <br />32 510 PIPE, SDR 26, 8" (0-6} LF 620 $32.00 $19,840.00 <br />33 510 PIPE, SDR 26, 6" (0-6} LF 48 $30.00 $1,440.00 <br />34 4' TRENCH PAVEMENT REPAIR SY 2 $150.D0 $300.fl0 <br />35 510 6" SERVICE CONNECTION EA 11 $1,200.00 $13,200.00 <br />TOTAL WATER CONSTRIlCTlON COST: $45,910.00 <br />Byrn ~ Associates, Inc. does not warrant or guarantee this "cost estimate" as an "actual cost" andlor if an "actual Construction Cost" is <br />required, andlor desired then construction bids should be obtained from appropriate sources. This estirnaie is being supplied for the applicable <br />client only and no representatians, warranties, or guarantees are rendered hereby to any other person or entity, <br />but not limited to. any mortgagor ar lending institution. <br />