Laserfiche WebLink
Gity of San Marcos <br />Marlton Estates <br />ENGINEERS CONSTRUCTION COST ESTIMATE <br />u ~mrrcuvtmtrv i <br />i <br />~~a~~+l.lJ't1.i11L~1'1,L ~.~y ~.'. <br />~VJ~~~ AlL1~~\~1W <br />Date: May 23,2008 <br />B(D SPEC UNIT <br />ITEM ITEM DESCRIPTION UNIT QTY PRICE <br />PRICE <br />No. No. <br />1 1105-A PREPARING RIGHT OF WAY <br />2 1105-A EXCAVATION (ROADWAY) <br />3 110S-A EMBANKMENT {ROADWAY ) <br />5 210S-B FLEXIBLE BASE (12" THICK} <br />G 306S PRIME COAT 0.25 GAL PER SY <br />7 3075 TACK COAT 0.05 GAL PER SY <br /> 340S HOT M!X ASPHALTIC PAVEMENT, TYPE U (2" <br /> TH IGK) <br />9 431 S CURB AND GUTTER <br />10 432S CONCRETE 51DEWALKS {4" THICK x 4' WIDE) <br />11 432S HANDICAP RAMPS ALL TYPES <br />12 432S CONCRETE DRIVEWAY <br />13 803S TRAFFIC SAFETY <br />14 824S SIGN STANDARDS <br />15 8245 SIGN PLATES <br />16 860S STRIPING <br />17 8715 THERMOPLASTIC DIRECTIONAL ARROWS, <br /> DIAMONDS AND STOP BARS <br />LS 1 $10,000.00 $10,000.00 <br />CY 150 $3.75 $562.50 <br />CY 50 $5.75 $287,50 <br />SY 1,380 $9.00 $12,420A0 <br />Gal 234 $3.50 $819.00 <br />Gal 47 $4.75 $223.25 <br />SY 937 $9..00 $8,433.00 <br />LF 801 $1.0.00 $8,010.00 <br />SY 175 $50.00 $8,750.00 <br />SF 44 $30.00 $1,320.00 <br />CY 0 5150.00 $0.00 <br />LS 1 $6,000.00 56,000.00 <br />EA 2 5140A0 $280.00 <br />EA 2 $140.00 $280.00 <br />LF 179 $0.62 $110.98 <br />EA 1 $146.00 $146.00 <br />TOTAL STREET CONSTRUGTEON COST: $57,642.23 <br />Byrn 8 Associates, Inc. does not warrant or guarantee this "cost estimate" as an "actual cast" and/or if an "actual Construction Cost" is <br />required, andlor desired then construction bids should be obtained Pram appropriate sources. This estimate is being supplied For the applicable <br />Gieni only and no representations, warranties, ar guarantees are rendered hereby to any other person or entity, <br />tsul nag limited ta, any mortgagor or lending institution. <br />