Laserfiche WebLink
City of San Marcos <br />Marlton Estates <br />SUMMARY OF COSTS <br />EXHIBIT A <br />ENGINEERS CONSTRUCTION CAST ESTIMATE <br />Prepared for: ARN1M MANAGEMENT <br />PAVING IMPROVEMENT <br />WASTEWATER IMPROVEMENT <br />WATER IMPROVEMENT <br />DRAINAGE IMPROVEMENT <br />MOBILIZATION (4%) <br />BONQS (3°!°) <br />INSURANCE (3%) <br />CONTINGENCY (10°I°) <br />Date: May 23,2008 <br />$57,642.23 <br />$45,910.00 <br />$11,458.50 <br />$132,198.50 <br />$9,888.37 <br />$7,416.00 <br />$7,416.00 <br />$24,721.00 <br />TOTAL PROJECT CONSTRUCTION COST $29fi 850.60 <br />Byrn & Associates, Inc. does not warrant or guarantee this "cost estimate" as an "actual cost" andlor if an "actual Construction Cost" is <br />required, andlor desired then construc6an bids shouid be obtained from appropriate sources. This estimate is being supplied far the applicable <br />client only and no representations, warranties, or guarantees are rendered hereby to any other person or entity, <br />but not Limited to, any mortgagor or lending institution. <br />3 VRN ~ <br />~~ <br />INGINEERS SURVEYORS <br />o ~~ <br />s.. <br />~_ } .._ <br />,. •a~ <br />f _ . <br />'~ ~ <br />