Laserfiche WebLink
Docusign Envelope ID: F6B6244A-CBB7-495E-964A-25E3FE08EC82 <br /> OWNER-CONTRACTOR AGREEMENT <br /> Thorpe Lane Sidewalk Improvements IFB, #2026-038 <br /> STATE OF TEXAS <br /> COUNTY OF HAYS <br /> This Agreement (this "Agreement") is entered into by and between The City of San Marcos, a <br /> municipality in the State of Texas ("Owner"), and Unity Contractor Services, Inc., 6448 E Hwy 290, <br /> Suite F113,Austin, TX 78723, ("Contractor"), and is effective for all purposes as of the date of the last <br /> signature to this Agreement("Effective Date"). <br /> Section 1. The Contractor agrees to commence, carry out, and complete all work for the <br /> construction of the Project for the Contract Amount of five hundred twenty thousand, seven hundred <br /> six dollars and 71/100s ($520,706.71) and within the Contract Time, in accordance with the Contract <br /> Documents. <br /> Section 2. The Owner agrees to pay the Contractor for the satisfactory performance of the Contract <br /> in accordance with the amount agreed to herein for all Work in accordance with the Bidding and Contract <br /> Documents, Project Manual, Drawings, and Addenda, which are incorporated herein by reference and <br /> described in Article 2 of the General Conditions which constitute the Contract between the Owner and the <br /> Contractor. Any unit prices contained in the Bid Form will apply to this Contract in case of subsequent <br /> quantity adjustments for work items. <br /> Section 3. The Contractor agrees to commence work by the project start date set in the Notice to <br /> Proceed, to finally complete and achieve final acceptance of the Project within the number of days <br /> specified in the Project Schedule on PS-1 which is incorporated by reference into this Owner-Contractor <br /> Agreement, subject to extensions of time as provided in the Contract Documents. Time is of the essence <br /> of this Agreement, and the Contractor acknowledges that the Owner will be damaged if the Contractor <br /> fails to complete the Project on time and in accordance with the Contract Documents. The Contractor <br /> agrees to ensure that workers' compensation insurance coverage will be provided for all persons employed <br /> on the Project. <br /> Section 4. The Contractor makes the following representations in order to enter into this <br /> Agreement with the Owner: <br /> a) The Contractor has examined,read, and understands the Contract Documents; <br /> b) The Contractor is familiar with the Project area and site, and all local, state, and federal laws <br /> and regulations that in any manner may affect cost,progress, or performance of the work; <br /> c) The Contractor has made and studied the results of examinations, investigations, and tests of <br /> subsurface and latent physical conditions which may affect the cost,progress, or performance of the work <br /> that the Contractor considers necessary to assure construction of the Project at the contract price within <br /> the contract time and in accordance with the Contract Documents, and no additional examinations, <br /> investigations,tests,reports, or other similar information will be required by the bidder for these purposes; <br /> d) The Contractor has reviewed all information in the Contract Documents with respect to existing <br /> underground facilities at or near the Project site, and the Contractor assumes responsibility for the exact <br /> nature and location of these underground facilities; and no additional examinations, investigations, tests, <br /> reports, or similar information will be required by the Contractor in order to construct the Project at the <br /> contract price within the contract time and in accordance with the Contract Documents, including Section <br /> 3.04 of the General Conditions; <br /> Rev 08.17.2022 OC-1 <br />