My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-002
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2010 10:48:22 AM
Creation date
1/15/2010 2:57:09 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2010-2
Date
1/5/2010
Volume Book
184
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
contract documents correctable prior to completion, and subject to any specific qualifications <br />stated in the Certificate for Payment); and that the Contractor is entitled to payment in the <br />amount certified. However, the issuance of a Certificate for Payment will not be a representation <br />that the Engineer has made any examination to ascertain how and for what purpose the <br />Contractor has used the monies paid by the City. <br />1.3.16 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Engineer's reasonable opinion, it is necessary or advisable for the <br />proper implementation of the intent of the construction contract documents, and with the <br />approval of the City, the Engineer will have authority to require special inspection or testing of <br />the work in accordance with the provisions of the construction contract documents, whether or <br />not such work is then fabricated, installed or completed. The Engineer will review the work and <br />results of all testing laboratories as required by the construction contract documents. <br />1.3.17 Review and make all decisions regarding the approval or taking of other appropriate <br />action upon the Contractor's submittals, including but not limited to, shop drawings, product data <br />and samples, schedule of values and progress schedule. The Engineer will take such action with <br />reasonable promptness, but generally, not to exceed 15 calendar days or such period as will not <br />cause delay of the Project. <br />1.3.18 Prepare minor changes in the plans and specifications as directed by the City; and prepare <br />necessary change orders in triplicate originals for approval by the City and execution in <br />accordance with the construction contract documents. The Engineer will not issue change orders <br />not previously approved in writing by City, and no course of conduct on the part of Engineer or <br />City will amend, waive or alter this provision. <br />1.3.19 Answer up to 50 Requests for Information ( "RFIs ") from the Contractor, which may <br />include technical questions, clarifications and interpretations of the construction contract <br />documents. The Engineer will keep a log of all RFIs and Contractor submittals for City review. <br />1.3.20 Conduct professional inspections to determine the dates of substantial completion and <br />final completion for the Project, to evaluate the work for acceptable conformance with the <br />construction contract documents and in light of any subsequent tests performed as described in <br />Subsection 1.3.15 to verify that any minor deviations from the construction contract documents <br />as described in Subsection 1.3.15 have been corrected and that the reasons for any specific <br />qualifications in any and all previous certificates for payment as described in Subsection 1.3.15 <br />hereof are either no longer valid or the condition(s) and/or problem(s) have been corrected; will <br />receive and review written warranties and related documents required by the construction <br />contract documents and assembled by the Contractor; will issue final certificates for payment or <br />take other appropriate action; and will make a written recommendation to the City regarding <br />City's acceptance of the Project. <br />1.3.21 Require the submission by the Contractor, and subcontractors performing work on the <br />Project site, of periodic wage rate payment reports and, with the City's assistance, verify <br />compliance with federal and state wage rate requirements for the Project; and notice the City of <br />any noncompliance, or of the failure by the Contractor or subcontractors to make submissions. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.