Laserfiche WebLink
Docusign Envelope ID: D7DF5AE1-3343-8771-83F4-5155BFB7D229 <br /> Scope of Work <br /> A.Federal Funding? If yes,add additional task to meet federal funding requirements. - <br /> 1)Task 1: <br /> 2)Task1I: <br /> 3)Task III: <br /> B,Data Coltection/Review,, <br /> 1)Review Reports/Studies/Drawings <br /> 2) Site Visit(s) <br /> 3) Staff Meeting(s) <br /> C.Survey-See General Requrements,inthe GIS,Checklist for Survey Requirements <br /> 1)Acquire Temporary Right of Entry <br /> 2)Establish Project Control—set 3 monuments minimum(typically every project) <br /> 3)ROW Survey—How detailed the ROW research needs to be?{Specify One} <br /> a) Route Survey per TSPS Manual of Practice Requirements for Category 2—Route Survey typically used for most project <br /> b) Boundary Survey—typically for full depth reconstruction with drainage. Signed and sealed boundary survey shall be submitted per <br /> TSPS Manual of Practice Requirements for Category lA—Land Title Survey <br /> 4)Existing Conditions Survey—Survey all utilities&surface features within the project limits. <br /> Elevations for all inverts and top of lids. How far inside ROW? XX Feet? <br /> 5)Topographic Survey{Specify One} <br /> a)Use COSM Lidar+Limited Topo Survey <br /> b)Full topographic survey with enough detail to prepare F contours <br /> 6)Tree Survey -Specify which level of details is needed. Project limits exhibit agreed on in advance.{Specify One} <br /> a)All trees 9"and above should be surveyed and tagged—Typical Option <br /> b)All trees&shrubs should be tagged within project limits—Rarely used <br /> c)Condition Assessment by Consultants/City Arborist after trees are tagged and surveyed by surveyor. <br /> Occurs after 6.a.and tree mitigation table and after 60%submittal. May be added by CIS if needed. <br /> D.Field Inve4igations,- <br /> 1) Subsurface Utility Locate <br /> 2)Geotechnical <br /> 3)Geological Assessment-Typically Recharge Zone Only <br /> E.Determine Easement/Land Acquisition Requirements <br /> 1)Prepare Aerial Exhibits showing Temporary Workspace Limits as well as proposed easement/ROW takings. <br /> 2)Field Notes <br /> 3)Appraisal —Typically completed with on-calls <br /> 4)Title Work—Typically completed with on-calls <br /> 5)Negotiations of Easements—Typically completed in-house <br /> A,Meetings " <br /> 1)Project Meetings <br /> 2)Public Meeting(s) <br /> 3)Prepare Exhibits For Public Meetings <br /> 4)Utility Coordination Meeting(s) <br /> &Pipelines- Wastewater(gravity,main) <br /> 1)Determine Alignment(s) <br /> 2)Preliminary Hydraulics/Modeling Typically not required;refer to Master Plans <br /> 3)Other( ) <br /> C,Pipelines Wastewater(force:main) <br /> 1)Determine Alignment(s) <br /> 2)Preliminary Hydraulics/Modeling Typically not required;refer to Master Plans <br /> 3)Other( ) <br /> D.Pipelines Water, <br /> 1)Determine Alignment(s) <br /> 2)Preliminary Hydraulics/Modeling Typically not required;refer to Master Plans <br /> 3)Other( ) <br /> E.Plants/Fac:tides. <br /> 1)Develop Design Parameters <br /> 2)Other( ) <br /> F.'Streets <br /> 1)Traffic Counts <br /> 2)Cross-Section Alternatives <br /> 3)Complete Street Assessment <br /> 4)Traffic Signals <br /> 5) Sidewalks <br /> 01/19/2021 1of5 <br />