My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-070 Approving a contract with H.W. Lochner, Inc.
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-070 Approving a contract with H.W. Lochner, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2026 3:23:53 PM
Creation date
6/3/2026 3:52:32 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-070
Date
5/5/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: D7DF5AE1-3343-8771-83F4-5155BFB7D229 <br /> 6)Other <br /> G,l,San IUfarcos Electric,(SMEU) <br /> 1)Underground Conduit <br /> 2)Photometric for Street Lighting(check with SMEU,they have in-house as well) <br /> 3)If effected by project,coordination required <br /> H,Drainage <br /> 1)Watershed Analysis <br /> 2)Determine Alignments <br /> 3)Preliminary Hydraulics/Modeling <br /> 4)LID/Water Quality <br /> 5)Other( ) <br /> L ProJecOystarnability <br /> 1)Alternative Methods For Construction-Alternatives City should consider to improve the project,include associated tradeoffs <br /> 2)Alternative Green Solutions <br /> 3)Review Engineering Sustainability Checklist <br /> J.Texas.His brie Commission - <br /> 1)Letter Only to THC-typically projects that occurs within limits of an existing road <br /> 2)Archeological-Desktop Review and short report to THC(Typically undisturbed areas) <br /> 3)Archeological-Full Review with Shovel Test and detailed report to THC <br /> K Determine Project Permitting/Design Requirements, <br /> Review Project to determine if any additional permits are needed(Typical Permits listed below) <br /> 1)TxDOT ROW <br /> 2)County ROW <br /> 3)Floodplain Zone <br /> 4)TCEQ <br /> a.Edwards Contributing <br /> b.Recharge Zone <br /> c.WPAP <br /> d.SCS <br /> 5)TPWD-Parks <br /> 6)UPRR-Railroad <br /> 7)FAA Jurisdiction <br /> 8)Army Corps <br /> 9)US Fish and Wildlife <br /> 10)Other( ) <br /> L.Utility Coordination; <br /> 1)Review Project to determine which utilities are within the project limits <br /> 2)Identify Utility Conflicts-Prepare an overall exhibit and utility conflict matrix <br /> 3)Coordinate with Utility Companies to resolve conflicts—Typically handled by City Staff <br /> 811 <br /> Pedernales Electric <br /> Bluebonnet Electric <br /> Century Link <br /> CenterPoint Gas <br /> Enterprise Gas <br /> American Tower <br /> LCRA <br /> Maxwell <br /> Time Warner <br /> Zayo <br /> AT&T <br /> Grande <br /> Texas State University <br /> Crystal Clear <br /> GBRA <br /> A Cast Estimate <br /> 1) Develop Construction Cost Estimates <br /> N.Deliverables - <br /> 1)Monthly Status Report(PDF) <br /> 2)Preliminary Engineering Report Draft(1 PDF) <br /> 3)Preliminary Engineering Report Final(1 PDF,1 DWG) <br /> 4)GIS Submittal Checklist&Additional Required Submittals. <br /> 5)Plan Sheets-Specify Size <br /> a)Roll Plot-size&scale as determined by Consultant <br /> b)11"x 17"per Engineering/CIP Plan Review Checklist <br /> 6)Notes: <br /> 01/19/2021 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.