Laserfiche WebLink
Docusign Envelope ID: D7DF5AE1-3343-8771-83F4-5155BFB7D229 <br /> i <br /> A,Meetings+. <br /> 1)Project Meetings <br /> Enter Weekly,Monthly,or Specify: <br /> 2)Public Meeting(s) <br /> 3)Prepare Exhibits For Public Meetings <br /> 4)Utility Coordination Meeting(s) <br /> B Design Sheet Categories <br /> 1) Cover Page <br /> 2) Index <br /> 3)General Notes <br /> 4)Quantity Table—By Sheet(Required by 90%submittal) <br /> 5)Project Layout&Survey <br /> 6)Typical Sections <br /> 7)Tree Mitigation-Table Of All Trees&Plan of Replacement Trees. If number of trees are small,show on Erosion Control Sheets <br /> 8)Erosion Control- {Specify} <br /> a.S WPPP-TXDOT Template(Required on all projects) <br /> b.EPIC-TXDOT Template(Required on all projects) <br /> c.Permanent&Temporary-combined as one plan set <br /> d.Permanent&Temporary-prepared as 2 separate plan sets <br /> 9) Sequence of Construction/Phase(can be combined with Traffic Control Narrative if needed) <br /> 10)Traffic Control Plan{Specify One} <br /> a.Minimum Requirements-simple write up and standard details <br /> b.Detailed Phasing-Typical Section&Plan Sheet for every phase <br /> 11)Removal <br /> 12)Roadway-Plan&Profile <br /> 13)Grading Plan For Intersections-show limits of accessible path <br /> 14)Driveways {Specify One} <br /> a.Plan&Profile for Each Driveway <br /> b.Driveway Table <br /> 15)Drainage <br /> a.Hydrologic Calculations <br /> b.Drainage Area Map <br /> c.Detention Basin,if Required <br /> d.Plan and Profile <br /> e.Laterals Profiles <br /> f.Water Quality <br /> 16) Structural <br /> 17)Retaining Walls{Specify One} <br /> a.Plan only-Typically 24"and smaller <br /> b.Plan&Profile-Typically 24"and larger <br /> 18)Water Line{Specify One} <br /> a.Plan only-Typically 8"Utility Project Only <br /> b.Plan&Profile-Required for 12"and Larger. May want it for Full Depth Reconstruction or Drainage Projects <br /> 19)Wastewater Plan&Profile <br /> 20)Force Main Plan&Profile <br /> 21)Reclaimed Water {Specify One} <br /> a.Plan only-Typically 8"Utility Project Only <br /> b.Plan&Profile-Required for 12"and Larger. May want it for Full Depth Reconstruction or Drainage Projects <br /> 22)Lift Station <br /> a.Site Plan <br /> b.Mechanical Plan <br /> c.Structural Plan <br /> e.Electrical Plan <br /> f.Control Panel Schematic Diagram <br /> g.RTU Schematic Diagram <br /> 23) Electrical—Underground{Specify One} (c-d"a-q) <br /> a.Plan only <br /> b.Plan&Profile <br /> 24)Electrical—Lighting <br /> 25)Traffic Signals <br /> a.Existing Layout <br /> b.Temporary Signal Design <br /> c.Proposed Signal Design <br /> d.Phasing&Timing Plan <br /> e.Signal Wiring <br /> 01/19/2021 3of5 <br />