My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-070 Approving a contract with H.W. Lochner, Inc.
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-070 Approving a contract with H.W. Lochner, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2026 3:23:53 PM
Creation date
6/3/2026 3:52:32 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-070
Date
5/5/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: D7DF5AE1-3343-8771-83F4-5155BFB7D229 <br /> f. Elevations <br /> g.Quantities&Notes <br /> 26) Signing&Pavement Markings <br /> 27)Utility Layout—(Color Coded) <br /> 28)Landscaping <br /> 29)Irrigation <br /> 30)Cross-Sections(Every 50') <br /> C.1?crmits <br /> 1)TDLR Review <br /> 2)COSM Floodplain Permit <br /> 3)TXDOT Permit—Typically submitted by COSM Staff <br /> 4)Hays County Permit <br /> 5)Others:TCEQ <br /> 6)Others: <br /> D.Utility Coordination - <br /> 1)Update Utility Conflicts-Prepare an overall exhibit and utility conflict matrix <br /> 2)Coordinate with Utility Companies to resolve conflicts—Typically handled by City Staff <br /> E.Deliverables (Must follow COSM CADD standards) <br /> 1)Monthly Status Report <br /> 2)30%Submittal(1 PDF,DWG)(1"=40'H&1"=10'V) <br /> a.Plan Set <br /> i.Plan Sheets(see items under III.b.Design Phase) <br /> i.Submittals may be delaved as indicated on the Engineering/CIP Plan Review Checklist <br /> b.Opinion of Probable Construction Cost <br /> c.Construction Schedule-Duration by Tasks <br /> e.GIS Submittal Checklist <br /> f. Engineering/CIP Plan Review Checklist <br /> 3)60%Submittal(1 PDF)(1"=40'H&1"=10'V) <br /> a.Plan Set <br /> i.Plan Sheets(see items under III.b.Design Phase) <br /> ii.Submittals may be delayed as indicated on the Engineering/CIP Plan Review Checklist <br /> iii.Profile of all utilities specified except Water&Force Main <br /> iv.List of Standard Details—COSM and COA <br /> v.List of Standard Specifications—COSM Div 1 and CO <br /> vi.Project Specific/Special Details <br /> b.Opinion of Probable Construction Cost <br /> c.Construction Schedule-Duration by Tasks <br /> e.Response Comments to 30%Design <br /> f.Engineering/CIP Plan Review Checklist <br /> 4)90%Submittal(1 PDF) <br /> a.Plan Set <br /> i.Plan Sheets(Include items from 60%submittal) <br /> ii.Quantities—Broken down by page <br /> iii.Profile of All Utilities Specified Above <br /> iv.Project Specific/Special Details <br /> b.Opinion of Probable Construction Cost <br /> c.Construction Schedule <br /> d.Specifications-Submitted as a single PDF <br /> i.Index of Specs <br /> ii.Modifications to Austin Specs <br /> iii.COSM Adopted Specs-Project Specific <br /> iv.Special Provisions <br /> v.Special Specifications <br /> e.Bid Form(Excel File) <br /> f.Response Comments to 60%Design <br /> h.Engineering/CIP Plan Review Checklist <br /> 5) 100%Submittal (1 PDF,1 DWG) <br /> a.Sealed Plan Set(include all items from 30%60%,&90%submittal) <br /> b.Opinion of Probable Construction Cost <br /> c.Construction Schedule <br /> d.Specifications-Submitted as a single PDF <br /> i.Index of Specs <br /> ii.Modifications to Austin Specs <br /> iii.COSM Adopted Specs-Project Specific <br /> iv.Special Provisions <br /> v.Special Specifications <br /> e.Bid Form(Excel File) <br /> f.Response Comments to 90%Design <br /> g.Engineering/CIP Plan Review Checklist <br /> 01/19/2021 4of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.