Laserfiche WebLink
CONTRACT PRICING WORKSHEET <br /> <br />For Standard Equipment Purchases Contract <br /> <br />No.: VE03-06 Date <br /> <br />Prepared: <br />1217!09 <br />This Form must be prepared by Contractor and given to End User. The H-GAC administrative fee shall be shown in Section <br />F. End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Work-sheet, to H- <br />GAC @ 713-993-4548. Please type or print legibly. <br />Buying <br />Agency: CITY OF SAN MARCOS Contractor. PHILPOTT MOTORS <br />Contact <br />Person: OSCAR HAIRELL Prepared <br />By: RICHARD HYDER <br />Phone: (512) 393-8034 Phone: (888) 973-5338 <br />Fax: Fax: (409) 724-0934 <br />Email: OHAIRELL(tDCI.SAN-MARCOS.TX.US Email: RICHARD. HYDERePHILPOTTMOTORS.COM <br />Product <br />Code: D31 Description: 2011 FORD F350 SUPERCAB <br />A. Product It em Base Unit Price Per Contractor's H-GAC Contract: $ 19.096.00 <br />B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable. <br />(Note: Published Options are options which were submitted and priced in Contractor's bid.) <br />Description Cost Description Cost <br />FLOOR PLAN INTEREST $ 401.02 EXTERIOR--WHITE $ _ <br />LOT INSURANCE $ 57.29 INTERIOR--GRAY VINYL $ - <br />6 SPD AUTOMATIC TRANSMISSION $ 11091.00 RK SERVICE BODY $ 5,036.00 <br />6.71, V8 DIESEL $ 6.545.00 <br />AIR CONDITIONING $ 627.00 <br />ANTILOCK BRAKES S _ <br />158" WB 56"CA $ _ <br />10100# GVWR SRW $ (647.00) <br />AMFM RADIO $ - <br />512 SPARE TIRE AND WHEEL $ 232.00 <br />54D TRAILER TOW MIRRORS $ 58.00 Subtotal From Additional Sheet(s): $ - <br />524 TILT WHEEL $ 150.00 Subtotal B: S 13.550.31 <br />C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary. <br />(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.) <br />Description Cost Description Cost <br />PDI CHARGE $ 80,00 <br />BX3A UPGRADE $ 950.00 Subtotal From Additional Sheet(s): $ - <br />BED CREDIT S (400.00) Subtotal C: S 630.00 <br />Check: Total cost of Unpublished Options (C) cannot exceed 25:6 of the total of the Base Unit <br /> <br />Price plus Published Options (A+B). <br />For this transaction the percentage is: <br />206 <br />D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.) <br />Description Cost Description Cost <br />DELIVERY 250 MILES $ 375.00 <br /> Subtotal D: $ 375.00 <br />E. Total Cost Before Any Applicable Trade-In / Other Allowances / Discounts (A+B+C+D) S 33.651.31 <br />Quantity Ordered: 1 X Subtotal of A + B + C + D: $ 33.651.31 = Subtotal E: $ 33.651.31 <br />F. H-GAC Fee Calculation (From Current Fee Tables) Subtotal F• $ - <br />G. Trade-Ins / Other Allowances / Special Discounts <br />Description Cost Description Cost <br /> I Subtotal G• $ - <br />Estimated Delivery Date: 60-90 DAYS ARO H. Total Purchase Price (E+F+G): S 33,65131