My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-099 Approving an angreement with BGE, Inc.to provide professional design and engineering services for the North Side 12-inch water connection project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-099 Approving an angreement with BGE, Inc.to provide professional design and engineering services for the North Side 12-inch water connection project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 2:11:12 PM
Creation date
7/14/2026 4:39:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-099
Date
7/7/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: B4237C90-FBOF-82E3-836F-A5CFD2F500AA <br /> C42 North Side 12 In Water Connection aka William Pettus Extension City of San Marcos <br /> Engineering Design Services Exhibit A <br /> Services to be Provided by City <br /> EXHIBIT A-CITY SERVICES <br /> • City of San Marcos will provide any available as-built files of existing infrastructure within the <br /> Project Limits, including the location and depth of the existing waterline on the south end of the <br /> Project that the proposed waterline will tie into. <br /> • City of San Marcos will provide any records available which would assist in the completion of the <br /> project development within two weeks of NTP. <br /> • City of San Marcos will provide timely reviews and decisions necessary to maintain the project <br /> work schedule. <br /> • City of San Marcos will complete negotiations of easements in-house. <br /> • City of San Marcos will coordinate with any utility companies to resolve conflicts for Phase 2. <br /> • City of San Marcos will be responsible for obtaining right of entry for properties outside of the <br /> County roadway project limits. <br /> • City of San Marcos will be responsible for the following construction phase tasks:final walk <br /> through, review of pay estimates, construction observation site visits and inspections. <br /> • City of San Marcos will manage all public advertisements for the Project. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.