My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-099 Approving an angreement with BGE, Inc.to provide professional design and engineering services for the North Side 12-inch water connection project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-099 Approving an angreement with BGE, Inc.to provide professional design and engineering services for the North Side 12-inch water connection project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 2:11:12 PM
Creation date
7/14/2026 4:39:01 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-099
Date
7/7/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: B4237C90-FBOF-82E3-836F-A5CFD2F500AA <br /> C42 North Side 12 In Water Connection aka William Pettus Extension City of San Marcos <br /> Engineering Design Services Exhibit B <br /> Services to be Provided by the Engineer <br /> EXHIBIT B—SCOPE OF SERVICES TO BE PROVIDED BY THE ENGINEER <br /> Project Background <br /> The City of San Marcos (City) plans to construct approximately 3,550 linear feet of new 12-inch waterline <br /> along the proposed William Pettus right of way that runs from FM 110 to SH 21 in San Marcos, Texas. The <br /> project will be split into two phases: Phase 1 to be constructed joint bid through an interlocal agreement <br /> between the City and Hays County (County), and Phase 2 to be constructed by the City following the <br /> construction of the County project. The Phase 1 portion of the waterline will connect to an existing City <br /> waterline on the south side of SH 21 and run along the proposed William Pettus right of way. The Phase 2 <br /> portion of the waterline will begin along the proposed William Pettus right of way and connect to a future <br /> Whisper residential development on the north end. <br /> BGE, Inc. (BGE) has been engaged to provide design, bid, and construction phase services for the North <br /> Side 12-inch Water Connection aka "William Pettus Extension" (Project). During a scoping kickoff meeting <br /> on March 17, 2026, the City directed BGE to scope the design, bid, and construction phase services. BGE <br /> will utilize survey, geotechnical engineering, and environmental engineering services that were performed <br /> with the County roadway project, in addition to scoping additional survey, geotechnical, and environmental <br /> engineering services for portions of the project that are outside the limits of the County project. The design <br /> phase will be broken into 30%, 60%, 90%, and 100%design with the schedule following the County roadway <br /> project schedule. <br /> Scope of Services <br /> BGE has prepared the following Scope of Services for the completion of the Project. The various tasks and <br /> deliverables are to be performed and submitted in accordance with the Project's approved schedule. <br /> I. Design Phase Services <br /> 1. Project Management and Meetings <br /> a) Project Management: Communication and submittals to the City shall be directed through the <br /> team's Project Manager, unless specifically authorized otherwise. The project management <br /> activities shall include task leadership and direction, telephone and written communication, project <br /> updates and status reports, project schedule, and personnel and data management. <br /> b) Meetings and Site Visits: Meetings will include submittal discussions, schedule updates, and <br /> overall project coordination. BGE will supply meeting minutes within one (1)week following the <br /> meeting. <br /> i) Site Visits: One (1)2-hour site visit during 30%design phase is included in this task. <br /> ii) Monthly Project Meetings: It is assumed that the Project Design Phase will occur over a 15- <br /> month period with a monthly 1-hour virtual project meeting with City staff,for a total of 15 <br /> meetings, held via MS Teams. <br /> iii) Monthly Utility Coordination Meetings:Attend utility coordination meetings over a 15-month <br /> design period, for a total of 15 meetings, held via MS Teams. It is assumed that the County <br /> roadway project will handle coordination with utility companies to resolve conflicts for Phase 1 <br /> and City staff will handle coordination with utility companies to resolve conflicts for Phase 2. <br /> c) Coordination with the Whisper Development for connection of the Phase 2 alignment. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.