not such work is then fabricated, installed or completed. The Engineer will review the work and <br />results of all testing laboratories as required by the construction contract documents. <br />1.5.23 Review and make all decisions regarding the approval or taking of other appropriate <br />action upon the Contractor's submittals, including but not limited to, shop drawings, product data <br />and samples, schedule of values and progress schedule. Such action will be taken with <br />reasonable promptness, but generally not to exceed 15 calendar days or such period of time as <br />will not cause delay of the Project. <br />1.5.24 Prepare minor changes in the plans and specifications as directed by the City; and prepare <br />necessary change orders in triplicate originals for approval by the City and execution in <br />accordance with the construction contract documents. Engineer will not issue change orders not <br />previously approved in writing by City, and no course of conduct on the part of Engineer or City <br />will amend, waive or alter this provision. <br />1.5.25 Conduct professional inspections to determine the dates of substantial completion and <br />final completion for the Project, to evaluate the work for acceptable conformance with the <br />construction contract documents and in light of any subsequent tests performed as described in <br />Subsection 1.5.21 to verify that any minor deviations from the construction contract documents <br />as described in Subsection 1.5.21 have been corrected and that the reasons for any specific <br />qualifications in any and all previous certificates for payment as described in Subsection 1.5.21 <br />hereof are either no longer valid or the condition(s) and/or problem(s) have been corrected; will <br />receive and review written warranties and related documents required by the construction <br />contract documents and assembled by the Contractor; will issue final certificates for payment or <br />take other appropriate action; and will make a written recommendation to the City regarding <br />City's acceptance of the Project. <br />1.5.26 Require the submission by the Contractor, and subcontractors performing work on the <br />Project site, of periodic wage rate payment reports and, with the City's assistance, verify <br />compliance with federal and state wage rate requirements for the Project; and notice the City of <br />any noncompliance, or of the failure by the Contractor or subcontractor's to make submissions. <br />1.5.27 Prepare, or cause to be prepared, and submit to the City a set of reproducible record <br />drawings showing significant changes in the work made during the construction phase. <br />1.5.28 Ensure that all notices and signs required and provided by the City and TxDOT are posted <br />in the appropriate locations at the Project site by the Contractor. <br />1.5.29 Conduct final inspection with the City and prepare a punch list prior to final acceptance <br />by the City. <br />1.5.30 Upon Project completion, the Engineer will issue and sign a "Notification of <br />Completion" acknowledging the Project's construction completion. Within six months after the <br />Project is completed, the Engineer will file with TxDOT and the City a set of as-built plans that <br />are signed, sealed and dated by the Engineer that incorporate any construction revisions. The <br />Engineer will certify that the Project was constructed in accordance with the as-built plans and <br />KBR-Sessom Drive Roadway Improvements Agreement <br />17 <br />