Laserfiche WebLink
<br />CITY OF SAN MARCOS <br />DISTRIBUTION LINE EXTENSION POLICY <br /> <br />APPENDIX H <br /> <br />TEMPORARY SERVICE <br /> <br />Extensions required to serve customers on a temporary basis <br />will be installed only if the applicant for tempo=ary ser- <br />vice pays the city, in advance, the standard cost c: instal- <br />linq and removinq all facilities expressly required for such <br />temporary service. <br /> <br />In situations where a temporary service is required :or con- <br />struction purposes, and such temporary line exte::sion re- <br />sults in a permanent meter upon completion of the construc- <br />tion, the City I s will extend such temporary serv=.ce which <br />contributes to a permanent electric service, at its option, <br />under the appropriate r~e for permanent extensions. <br />