Laserfiche WebLink
<br />SAN MARCOS ELECTRIC UTILITY <br /> <br />ELECTRIC TARIFF <br /> <br />ISSUED BY: <br /> <br />CITY OF SAN MARCOS, TEXAS <br /> <br />SHEET NO. <br /> <br />EFFECTIVE DATE: <br /> <br />REVISION NO. <br /> <br />STREET LIGHTING SERVICE <br />AND <br />TRAFFIC SIGNAL SERVICE <br />RATE SCHEDULE - SL <br /> <br />MONTHLY RATE (continued) <br /> <br />400 Watt, 21,000 Lumens.............$ 6.05 per Lamp <br /> <br />Energy Charge...........................the monthly <br />Power Cost Adjustment factor applied to 155 kWh. <br /> <br />Metered Street Lighting: <br /> <br />Mercury Vapor Lamp <br />175 Watt, 7,900 Lumens <br /> <br />Energy Charge....................... $ <br /> <br />400 Watt, 21,000 Lumens <br />Energy Charge....................... $ <br /> <br />0.03854 per kWh <br />0.03854 per kWh <br />0.02989 per kWh <br /> <br />Traffic Signals: <br /> <br />Energy Charge....................... $ <br /> <br />The above rate per kWh will be adjusted plus or minus in <br />accordance with the formula specified in the Power Cost Adjust- <br />ment Clause. <br /> <br />MINIMUM CHARGE <br /> <br />No monthly minimum charge is ,applicable at this time. <br /> <br />PAYMENT <br /> <br />The due date of the bill shall be fifteen (15) days after <br />issuance, and payment must be received in the electric utility <br />office of the city by 5:00 P.M. on the due date. Any and all <br />amounts remaining unpaid after the due date shall be assessed a <br />charge in the amount of ten percent (10%) of the unpaid amount. <br /> <br />I <br />