Laserfiche WebLink
<br />CXk:."'J1U.,.-.r~œ CXE'.r BS"l'DP&m <br /> <br />DAm: <br /> <br />0ct:dJer: 27, 1987 <br /> <br />Item !b. 2 <br /> <br />Im1I!C.r: Hew M.I.R.L., R.B.I.L. for J~('n~l.ttJCted <br />RunIray 08-26, aDd 1b1 Lighted ~]~ <br />Wind Qmes , San Muccø Ibù ~ ~ A:i.rpart , <br />San Mf:u:ccø , Texas <br /> <br />P.œpøred by: Mi.chae1 ~ 1txIœ, P.B. <br /> <br />Item No. Description Quanti ty Unit Cost Amount <br />1 M.I.R.L. 69 Each $150.00 $10,350 <br />2 R.E.I.L. (Sets) 2 Each $6,000.00 $12,000 <br />3 Cable Trench <br /> Open & Closed 13,260 L.F. $0.75 $9,945 <br />4 5000 Volt Cable 16,500 L.F. $0.55 $9,075 <br />5 Counterpoise Wire 18,000 L.F. $0.35 $6,300 <br />6 Control Equipnent 1 L.So $7,000.00 $7,000 <br />7 Taxiway Signs 12 Each $1,100.00 $13,200 <br />8 Runway Bone 640 LoF. $40.00 $25,600 <br />9 4-Way Duct 510 L.F. $30.00 $15,300 <br />10 Non-Lighted S1w1ementa1 <br /> Wind Cones 2 Each $2,000.00 $4,000 <br /> --------- <br /> Subtotal $112,770 <br /> Contingencies $11,277 <br /> ----- <br /> Total Construction Cost $124,047 <br /> Engineering Fee $5,153 <br /> Testing $1,000 <br /> Inspection $3,400 <br /> ------- <br /> 'roTAL ESTIMATE $133,600 <br />