Laserfiche WebLink
<br />DAm: <br /> <br />October 21,1981 <br /> <br />Œk:»~"r~CIf CXS'r :&ST1Ml\TE <br /> <br />PIÐ1JC1": ~..,LLdCt Bdst::i.nq Taxiway 8A8, <br />San MI!Irmø Ibrl cl ~ Airport , <br />San MI!Irmø , Texas <br /> <br />PJ:'epu:ed by: Micbael. ~ MoaIe, P.B. <br /> <br />Item No. 3 <br /> <br />Itan No. Description Quantity Uni t <br />1 2" HWI£.. Surface Course 265 Ton <br />2 Crushed Aggregate <br /> Make-Up Base 268 C.Y. <br />3 Cold Mix Recycle <br /> Base Material 2,434 S.Y. <br />4 Bituminous Prime Coat 852 Gal. <br />5 Taxiway Painting 340 S.F. <br />6 Retroreflecti ve Markers 16 Each <br /> SUbtotal <br /> Contingencies <br /> Total Construction Cost <br /> Engineering Fee <br /> Testing <br /> Surveying <br /> Construction Inspection <br /> 'IDTAL ESTIMATE <br /> <br />Cost Arrount <br />$30.00 $7,950 <br />$20.00 $5,360 <br />$1. 75 $4,260 <br />$1.15 $980 <br />$0.55 $187 <br />$10.00 $160 <br /> ------- <br /> $18,897 <br /> $1,890 <br /> --------- <br /> $20,787 <br /> $1,663 <br /> $1,700 <br /> $1,000 <br /> $2,850 <br /> ------ <br /> $28,000 <br />