Laserfiche WebLink
<br />ARCHITECT <br /> <br />and <br /> <br />the <br /> <br />ARCHITECT's <br /> <br />consultants, <br /> <br />the <br /> <br />cost <br /> <br />of <br /> <br />the <br /> <br />land, rights-of-way, or other costs which are the responsibility of the <br /> <br />OWNER as provided in Article 2. <br /> <br />3.2 <br /> <br />RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.2.1 <br /> <br />Evaluations of the OWNER's Project budget and detailed cost <br /> <br />estimates, if any, prepared by the ARCHITECT, represent the ARCHITECT's <br /> <br />best judgment as a design professional familiar with the construction <br /> <br />industry. <br /> <br />3.2.2 <br /> <br />A fixed limit of construction cost will be established for <br /> <br />this <br /> <br />Project(s) . <br /> <br />The <br /> <br />ARCHITECT <br /> <br />shall <br /> <br />be <br /> <br />permitted <br /> <br />to <br /> <br />include <br /> <br />contingencies for design, bidding and price escalation, to determine <br /> <br />what materials, equipment, component systems and types of construction <br /> <br />are to be included in the construction contract documents, <br /> <br />to make <br /> <br />reasonable adjustments in the scope of the Project(s) and to include in <br /> <br />the <br /> <br />construction <br /> <br />contract <br /> <br />documents <br /> <br />alternate <br /> <br />bids <br /> <br />to <br /> <br />adjust <br /> <br />the <br /> <br />construction cost to the fixed limit. <br /> <br />The fixed limit of construction <br /> <br />cost may be increased by OWNER. <br /> <br />Any such increase in the fixed limit <br /> <br />of construction cost shall not result in increased compensation to <br /> <br />ARCHITECT unless same is the result of revisions requested by OWNER in <br /> <br />accordance with Section 1. 6. 1 hereof, <br /> <br />and in such event, ARCHITECT <br /> <br />shall be compensated as provided in Section 13.2.1 hereof. <br /> <br />3.2.3 <br /> <br />I f the <br /> <br />lowest bona <br /> <br />fide bid exceeds the <br /> <br />Fixed Limit of <br /> <br />Construction Cost established as a condition of this Agreement, <br /> <br />the <br /> <br />OWNER shall <br /> <br />(1) <br /> <br />give written approval of an increase in such fixed <br /> <br />limit, <br /> <br />(2) <br /> <br />authorize <br /> <br />rebidding <br /> <br />or renegotiating of the <br /> <br />Project(s) <br /> <br />within a reasonqble time, or (3) cooperate in revising the Project(s) <br /> <br />scope and quality to reduce the Construction Cost. <br /> <br />Services provided <br /> <br />by the ARCHITECT regarding items ( 2 ) <br /> <br />and ( 3 ) <br /> <br />above or other actions <br /> <br />requested by the OWNER in writing shall be undertaken as an additional <br /> <br />;ervice and as such compensation shall be in accordance with Section <br /> <br />...3.2 . 1 hereof. <br /> <br />During the development of the project(s) <br /> <br />through the <br /> <br />phases described by Article 1 of this Agreement and prior to final <br />approval of construction contract documents, plans and specifications <br /> <br />by <br /> <br />the <br /> <br />OWNER, <br /> <br />the ARCHITECT <br /> <br />shall <br /> <br />monitor <br /> <br />the <br /> <br />estimated <br /> <br />probable <br /> <br />construction cost in relation to the established fixed limit. <br /> <br />-12- <br />