My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-002
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2004 10:29:26 AM
Creation date
5/20/2004 2:36:06 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-19
Date
1/12/2004
Volume Book
154
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.9.1 Provide administration of the construction contract as set forth in the construction documents <br />unless otherwise provided in this Agreement and incorporated in the construction contract <br />documents. Engineer will not pursue a course of conduct which might jeopardize any of the City's <br />rights thereunder. Minor deviations from the construction contract documents that do not affect the <br />validity of performance bond(s) are permitted. <br /> <br />1.9.2 Be a representative but not an agent of the City during the construction phase, and advise and <br />consult with the City and provide progress reports and advice to the City in writing; forward the <br />City' s instructions to the Contractor unless (1) Engineer is unavailable by telephonic communication <br />or otherwise to issue instructions necessary for the proper progress and acceptance of work; (2) <br />jeopardy t o 1 ife and/or property exists; and/or (3) lack o f instructions and/or unavailability o f <br />Engineer will result in, in City' s opinion, harm to City, in which case instructions may be forwarded <br />directly to the Contractor by the City; have authority to act on behalf of the City only to the extent <br />provided herein and in the construction contract documents unless otherwise modified by written <br />instrument in accordance with Section 12.1. Any instructions issued directly by City to Contractor <br />will be promptly communicated to the Engineer if the Engineer was unavailable at the time of <br />issuance of instructions. <br /> <br />1.9.3 Attend a pre-construction conference with the Contractor, members of City's staff, <br />representatives of affected utility providers, and federal and state agencies having jurisdiction over <br />the Project (including City inspectors) in order to establish construction schedules and to identify <br />key representatives of the parties and lines of communication. <br /> <br />1.9.4 Assist the Cityin ensuring that all applicable permits and approvals have been obtained from <br />the appropriate agencies prior to construction. <br /> <br />1.9.5 Make on-site inspections of the Project at least bi-weekly during significant construction <br />activity and otherwise as necessary to ensure familiarity with the progress and quality of the work, <br />to determine if the work is proceeding in acceptable conformance with the construction contract <br />documents, and to review the work with the City's designated representatives. On the basis of such <br />on-site inspections by the Engineer, the Engineer will keep the City informed of the progress and <br />quality of the work through written status reports and through meetings with the City's <br />representative; and will also be reasonably available to perform site visitations at the specific request <br />of the City by the next business day after a request is made. <br /> <br />1.9.6 Not have control or charge of and will not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions and programs in connection with the <br />work, for the acts or omissions of the Contractor, subcontractors or any other persons performing <br />any of the work, or for the failure of any of them to carry out the work in accordance with the <br />construction contract documents unless such acts or omissions are due to the negligence of the <br />Engineer or are acts or omissions under the Engineer's control. However, Engineer will exercise its <br />authority on behalf of City in accordance herewith and particularly during the construction phase so <br />that all work performed by the Contractor results in a Project completed in accordance with the <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.