My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-035
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2004 11:04:20 AM
Creation date
5/28/2004 4:07:45 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-35
Date
2/23/2004
Volume Book
154
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Work Plan and Schedule <br /> <br />Once receiving an authorization to proceed, we will begin the submittal process, if <br />required. We would normally expect this process to take 45 days. Once submittals are <br />approved we will procure material. We would expect 90 to 120 days to procure material <br />and fabricate enclosures. An additional 120 days would be required for system <br />installations. Following installation the as built documentation would be developed <br />taking approximately 30 days. <br /> <br />We understand the City is hiring a new SCADA technician and would like this individual <br />to assist as much as possible during the installation. We believe this to be an excellent <br />approach that will put the City in a position to service and maintain this system. The <br />City's technician will assist our crew by helping with tower construction, identifying <br />buried equipment and existing conductors. Aisc by assisting with running conduit and <br />pulling wire. Additionally., this individual would provide information regarding individual <br />pump station control specifics. <br /> <br />Our work plan will begin by developing the central site configurations and remote site <br />DJc algorithms. This work will be done off site~ The first task on site will be installing the <br />ntral site equipment. Once the CSE is installed the remote installations will begin. <br />is approach will allow for our installations without interfering with the existing SCADA <br />system operation. We would expect to work very closely with San Marcos utility staff so <br />as to minimize interruptions to normal operations. <br /> <br /> <br />