Laserfiche WebLink
Work Plan and Schedule <br /> <br />Once receiving an authorization to proceed, we will begin the submittal process, if <br />required. We would normally expect this process to take 45 days. Once submittals are <br />approved we will procure material. We would expect 90 to 120 days to procure material <br />and fabricate enclosures. An additional 120 days would be required for system <br />installations. Following installation the as built documentation would be developed <br />taking approximately 30 days. <br /> <br />We understand the City is hiring a new SCADA technician and would like this individual <br />to assist as much as possible during the installation. We believe this to be an excellent <br />approach that will put the City in a position to service and maintain this system. The <br />City's technician will assist our crew by helping with tower construction, identifying <br />buried equipment and existing conductors. Aisc by assisting with running conduit and <br />pulling wire. Additionally., this individual would provide information regarding individual <br />pump station control specifics. <br /> <br />Our work plan will begin by developing the central site configurations and remote site <br />DJc algorithms. This work will be done off site~ The first task on site will be installing the <br />ntral site equipment. Once the CSE is installed the remote installations will begin. <br />is approach will allow for our installations without interfering with the existing SCADA <br />system operation. We would expect to work very closely with San Marcos utility staff so <br />as to minimize interruptions to normal operations. <br /> <br /> <br />