0 0 0
<br />City of San Marcos
<br />BID TABS
<br />MCCARTY LANE PHASE II
<br />(THURSDAY, MARCH 4, 2010)
<br />Notes: Items in read are noted discrepancies in the bid documents.
<br />For Harris Road: Items
<br />36, 40,43, 65, 66, 92, 98,101,114,115. 116,123,124,126,127,130,135,136 ,139,140,141,142,143,144,145, &148
<br />the Unit Totals shown did not match the calculated value using the written (or numeric) unit price per unit
<br />bid multiplied by the quantity. Written unit bids were used and the unit total was recalculated. The
<br />corrections resulted in an overall reduction of bid of $123.65.
<br />For Cash Construction: Item 157 was shown written words as $45, numerically as $450. Confirmed to be
<br />$450.00 per unit.
<br />PAGE 5 OF 15
<br />Texas Sterling
<br />Harris Road Co.
<br />Hunter Industries
<br />Item No.
<br />Bid Code
<br />DESCRIPTION
<br />UNIT
<br />Quant
<br />Unit Bid
<br />Unit Total
<br />Unit Bid
<br />Unit Total
<br />Unit Bid
<br />I Unit Total
<br />169
<br />510 -JW -18X18
<br />WET CONNECTION 18 "X18" DIA.
<br />EA
<br />2
<br />$1,750.00
<br />$3,500.00
<br />$6,930.00
<br />$13,860.00
<br />$1,800.00
<br />$3,600.00
<br />170
<br />510 -JW -24X24
<br />WET CONNECTION 24 "X24" DIA.
<br />EA
<br />1
<br />$1,800.00
<br />$1,800.00
<br />$7,650.00
<br />$7,650.00
<br />$2,400.00
<br />$2,400.00
<br />171
<br />510 -KW
<br />DUCTILE IRON FITTINGS
<br />TON
<br />3.1
<br />$500.00
<br />$1,550.00
<br />$5,500.00
<br />$17,050.00
<br />$10,285.00
<br />$31,883.50
<br />172
<br />511 -G
<br />AUTOMATIC COMBINATION AIR/VACUUM
<br />RELEASE
<br />VALVE ASSEMBLY, 2" DIAMETER
<br />EA
<br />6
<br />$1,600.00
<br />$9,600.00
<br />$1,970.00
<br />$11,820.00
<br />$1,270.00
<br />$7,620.00
<br />173
<br />511S -A16
<br />GATE VALVE (RESILIENT SEATED GATE TYPE)
<br />16 IN C -509
<br />EA
<br />6
<br />$5,400.00
<br />$32,400.00
<br />$5,650.00
<br />$33,900.00
<br />$6,075.00
<br />$36,450.00
<br />174
<br />511S -A24
<br />GATE VALVE (RESILIENT SEATED GATE TYPE)
<br />24 IN C -151
<br />EA
<br />1
<br />$16,500.00
<br />$16,500.00
<br />$18,700.00
<br />$18,700.00
<br />$17,700.00
<br />$17,700.00
<br />175
<br />511S -A6
<br />GATE VALVE (RESILIENT SEATED GATE TYPE)
<br />(6 IN) C -509
<br />EA
<br />18
<br />$750.00
<br />$13,500.00
<br />$683.00
<br />$12,294.00
<br />$765.00
<br />$13,770.00
<br />176
<br />511S -B
<br />FIRE HYDRANT ASSEMBLY
<br />EA
<br />18
<br />$2,500.00
<br />$45,000.00
<br />$2,800.00
<br />$50,400.00
<br />$2,075.00
<br />$37,350.00
<br />177
<br />5115 -DSP
<br />DISINFECTION SAMPLING PORT
<br />EA
<br />6
<br />$1,550.00
<br />$9,300.00
<br />$1,530.00
<br />$9,180.00
<br />$1,260.00
<br />$7,5607
<br />178
<br />511S -E
<br />DRAIN VAVLE
<br />EA
<br />1
<br />$2,250.00
<br />$2,250.00
<br />$2,550.00
<br />$2,550.00
<br />$2,140.00
<br />$2,140.00
<br />179
<br />701S -C
<br />TEMPORARY CHAIN LINK VEHICULAR GATE FOR
<br />TEMPORARY STAGING
<br />EA
<br />1
<br />$700.00
<br />$700.00
<br />$950.00
<br />$950.00
<br />$250.00
<br />$250.00
<br />180
<br />701S -H
<br />TEMPORARY SECURITY FENCE, FOR STAGING
<br />AREA
<br />LF
<br />373
<br />$15.00
<br />$5,595.00
<br />$12.25
<br />$4,569.25
<br />$5.00
<br />$1,865.00
<br />181
<br />Volume II
<br />802S -B
<br />PROJECT SIGN
<br />SUB TAL VOLUME I
<br />LS
<br />2
<br />$400.00
<br />$800.00
<br />$5,898,902.24
<br />$510.00
<br />$1,020.00
<br />$5,921,642.65
<br />$350.00
<br />$700.00
<br />$6,005,266.98
<br />182
<br />506S
<br />MANHOLES, STANDARD 8' DEEP, 48" DIAMETER
<br />EA
<br />10.00
<br />$5,000.00
<br />$50,000.00
<br />$3,570.00
<br />$35,700.00
<br />$3,580.00
<br />$35,800.00
<br />183
<br />506S
<br />ADDITIONAL DEPTH ON MANHOLES
<br />VF
<br />44.00
<br />$75.00
<br />$3,300.00
<br />$306.00
<br />$13,464.00
<br />$100.00
<br />$4,400.00
<br />184
<br />509S
<br />TRENCH SAFETY
<br />LF
<br />3265.00
<br />$1.00
<br />$3,265.00
<br />$1.50
<br />$4,897.50
<br />$1.00
<br />$3,265.00
<br />185
<br />510
<br />PIPE, SDR 26,15" ALL DEPTHS
<br />LF
<br />3020.00
<br />$58.00
<br />$175,160.00
<br />$50.00
<br />$151,000.00
<br />$38.00
<br />$114,760.00
<br />186
<br />510
<br />PIPE HOBAS 21" DIAMETER
<br />LF
<br />245.00
<br />$98.00
<br />$24,010.00
<br />$112.00
<br />$27,440.00
<br />$84.00
<br />$20,580.00
<br />187
<br />188
<br />189
<br />510
<br />510
<br />510
<br />OPEN CUT AND INSTALL 27" STEEL ENCASEMEIN
<br />OPEN CUT AND INSTALL 33" STEEL ENCASEMEIN
<br />CONNECT TO EXISTING MANHOLE
<br />LF
<br />LF
<br />EA
<br />30.00
<br />141.50
<br />1.00
<br />$160.00
<br />$200.00
<br />$2,900.00
<br />$4,800.00
<br />$28,300.00
<br />$2,900.00
<br />$204.00
<br />$244.00
<br />$2,240.00
<br />$6,120.00
<br />$34,526.00
<br />$2,240.00
<br />$228.00
<br />$219.00
<br />$1,500.00
<br />$6,840.00
<br />$30,988.50
<br />$1,500.00
<br />190
<br />510
<br />CONNECT TO EXISTING STUBOUT
<br />EA
<br />1.00
<br />$1,450.00
<br />$1,450.00
<br />$1,020.00
<br />$1,020.00
<br />$300.00
<br />$300.00
<br />SUBTOTAL VOLUME II
<br />$293,185.00
<br />$276,407.50
<br />$218,433.50
<br />PROJECT TOTAL
<br />$6,192,087.24
<br />$6,198,050.15
<br />$6;223,700.48
<br />Notes: Items in read are noted discrepancies in the bid documents.
<br />For Harris Road: Items
<br />36, 40,43, 65, 66, 92, 98,101,114,115. 116,123,124,126,127,130,135,136 ,139,140,141,142,143,144,145, &148
<br />the Unit Totals shown did not match the calculated value using the written (or numeric) unit price per unit
<br />bid multiplied by the quantity. Written unit bids were used and the unit total was recalculated. The
<br />corrections resulted in an overall reduction of bid of $123.65.
<br />For Cash Construction: Item 157 was shown written words as $45, numerically as $450. Confirmed to be
<br />$450.00 per unit.
<br />PAGE 5 OF 15