<br />1
<br />100 -2002
<br />PREPARING ROW
<br />STA
<br />54
<br />$2,000.00
<br />$108,000.00
<br />$1,300.00
<br />$70,200.00
<br />$765.00
<br />$41,310.00
<br />2
<br />106 -2001
<br />OBLITERATING ABANDONED ROAD
<br />STA
<br />46.4
<br />$240.00
<br />$11,136.00
<br />$800.00
<br />$37,120.00
<br />$365.00
<br />$16,936.00
<br />3110
<br />-2001
<br />EXCAVATION ROADWAY
<br />CY
<br />9709
<br />$3.50
<br />$33,981.50
<br />$2.10
<br />$20,388.90
<br />$7.40
<br />$71,846.60
<br />4
<br />EMBANKMENT FINAL ORD COMP TY B
<br />CY
<br />39514
<br />$11.50
<br />$454,411.00
<br />$12.00
<br />$474,168.00
<br />$11.00
<br />$434,654.00
<br />5
<br />160 -2003
<br />FURNISHING AND PLACING TOPSOIL 4"
<br />SY
<br />71262.4
<br />$1.00
<br />$71,262.40
<br />$2.00
<br />$142,524.80
<br />$0.70
<br />$49,883.68
<br />6
<br />161 -2012
<br />GENERAL USE COMPOST
<br />CY
<br />41.9
<br />$40.00
<br />$1,676.00
<br />$41.00
<br />$1,717.90
<br />$38.00
<br />$1,592.20
<br />7
<br />164 -2039
<br />DRILL SEEDING PERM URBAN CLAY
<br />SY
<br />67779.4
<br />$0.08
<br />$5,422.35
<br />$0.14
<br />$9,489.12
<br />$0.05
<br />$3,388.97
<br />8
<br />164 -2041
<br />DRILL SEEDING TEMP WARM
<br />SY
<br />28319
<br />$0.10
<br />$2,831.90
<br />$0.14
<br />$3,964.66
<br />$0.05
<br />$1,415.95
<br />9
<br />168 -2001
<br />VEGETATIVE WATERING
<br />MG
<br />1133
<br />$10.00
<br />$11,330.00
<br />$11.00
<br />$12,463.00
<br />$20.60
<br />$23,339.80
<br />10
<br />169 -2001
<br />SOIL RETENTION BLANKETS CL 1 TY A
<br />SY
<br />3483
<br />$1.00
<br />$3,483.00
<br />$1.00
<br />$3,483.00
<br />$1.00
<br />$3,483.00
<br />11
<br />170 -2001
<br />IRRIGATION SYSTEM
<br />LS
<br />1
<br />$84,000.00
<br />$84,000.00
<br />$87,000.00
<br />$87,000.00
<br />$73,000.00
<br />$73,000.00
<br />12192
<br />-2012
<br />MULCH
<br />CY
<br />88.2
<br />$30.00
<br />$2,646.00
<br />$31.00
<br />$2,734.20
<br />$47.00
<br />$4,145.40
<br />13
<br />192 -2016
<br />PLANT BED PREPARATION
<br />SY
<br />1567.2
<br />$7.00
<br />$10,970.40
<br />$7.50
<br />$11,754.00
<br />$13.00
<br />$20,373.60
<br />14
<br />192 -2024
<br />PLANT MATERIAL 30 GAL TREE
<br />EA
<br />207
<br />$215.00
<br />$44,505.00
<br />$223.00
<br />$46,161.00
<br />$273.00
<br />$56,511.00
<br />15
<br />192 -2027
<br />PLANT MATERIAL 100 GAL TREE
<br />EA
<br />78
<br />$900.00
<br />$70,200.00
<br />$935.00
<br />$72,930.00
<br />$989.00
<br />$77,142.00
<br />16
<br />192 -2028
<br />PLANT MATERIAL 1 GAL SHRUB
<br />EA
<br />278
<br />$5.00
<br />$1,390.00
<br />$5.00
<br />$1,390.00
<br />$10.00
<br />$2,780.00
<br />17
<br />192 -2031
<br />PLANT MATERIAL 5 GAL SHRUB
<br />EA
<br />674
<br />$17.00
<br />$11,458.00
<br />$18.00
<br />$12,132.00
<br />$21.00
<br />$14,154.00
<br />18
<br />192 -2032
<br />PLANT MATERIAL 10 GAL SHRUB
<br />EA
<br />256
<br />$115.00
<br />$29,440.00
<br />$119.00
<br />$30,464.00
<br />$116.00
<br />$29,696.00
<br />19
<br />193 -2001
<br />PLANT MAINTENANCE
<br />MO
<br />6
<br />$4,600.00
<br />$27,600.00
<br />$4,800.00
<br />$28,800.00
<br />$3,400.00
<br />$20,400.00
<br />20
<br />193 -2014
<br />IRRIG SYS OPER AND MAINT (SCH A
<br />MO
<br />6
<br />$310.00
<br />$1,860.00
<br />$322.00
<br />$1,932.00
<br />$2,800.00
<br />$16,800.00
<br />21
<br />247 -2044
<br />FL BS (CMP IN PLC TY A GR 4 FNAL POS
<br />CY
<br />9310
<br />$24.00
<br />$223,440.00
<br />$25.00
<br />$232,750.00
<br />$24.30
<br />$226,233.00
<br />22260-2016
<br />LIME (HYD, COM, OR QK SLURRY
<br />TON
<br />1209
<br />$130.00
<br />$157,170.00
<br />$149.00
<br />$180,141.00
<br />$110.00
<br />$132,990.00
<br />23260-2027
<br />LIME TRT EXST MATL 8"
<br />SY
<br />37772
<br />$1.50
<br />$56,658.00
<br />$2.70
<br />$101,984.40
<br />$1.00
<br />$37,772.00
<br />24310-2005
<br />PRIME COAT MC -30 OR AE-P)
<br />GAL
<br />7556
<br />$3.50
<br />$26,446.00
<br />$3.75
<br />$28,335.00
<br />$3.60
<br />$27,201.60
<br />25341-2011
<br />D -GR HMA QCQA TY -B PG64 -22
<br />TON
<br />5292
<br />$64.00
<br />$338,688.00
<br />$61.00
<br />$322,812.00
<br />$58.00
<br />$306,936.00
<br />26341-2050
<br />D -GR HMA QCQA TY -C PG70 -22
<br />TON
<br />3527
<br />$65.00
<br />$229,255.00
<br />$71.00
<br />$250,417.00
<br />$68.00
<br />$239,836.00
<br />27
<br />400 -2006
<br />CUT & RESTORING PAV
<br />SY
<br />149
<br />$40.00
<br />$5,960.00
<br />$42.00
<br />$6,258.00
<br />$55.00
<br />$8,195.00
<br />28401-2001
<br />FLOWABLE BACKFILL
<br />CY
<br />28
<br />$80.00
<br />$2,240.00
<br />$103.00
<br />$2,884.00
<br />$110.00
<br />$3,080.00
<br />29.402-2001
<br />TRENCH EXCAVATION PROTECTION
<br />LF
<br />476
<br />$1.00
<br />$476.00
<br />$5.50
<br />$2,618.00
<br />$3.30
<br />$1,570.80
<br />30416-2002
<br />DRILL SHAFT 24 IN
<br />LF
<br />1984
<br />$45.00
<br />$89,280.00
<br />$104.00
<br />$206,336.00
<br />$43.00
<br />$85,312.00
<br />31
<br />416 -2029
<br />DRILL SHAFT RDWY ILL POLE 30 IN
<br />LF
<br />240
<br />$90.00
<br />$21,600.00
<br />$105.00
<br />$25,200.00
<br />$88.00
<br />$21,120.00
<br />32420-2001
<br />CL A CONC MISC
<br />CY
<br />3
<br />$600.00
<br />$1,800.00
<br />$431.00
<br />$1,293.00
<br />$1,500.00
<br />$4,500.00
<br />33420-2003
<br />CL C CONC ABUT
<br />CY
<br />65
<br />$550.00
<br />$35,750.00
<br />$755.00
<br />$49,075.00
<br />$458.00
<br />$29,770.00
<br />34420-2004
<br />CL C CONC BENT
<br />CY
<br />177.5
<br />$600.00
<br />$106,500.00
<br />$780.00
<br />$138,450.00
<br />$661.00
<br />$117,327.50
<br />35420-2033
<br />CL S CONC APPR SLAB
<br />CY
<br />195.6
<br />$350.00
<br />$68,460.00
<br />$440.00
<br />$86,064.00
<br />$255.00
<br />$49,878.00
<br />36.422-2001
<br />REINF CONC SLAB
<br />SF
<br />32010
<br />$7.00
<br />$224,070.00
<br />$6.25
<br />$200,062.50
<br />$8.25
<br />$264,082.50
<br />37423-2001
<br />RETAINING WALL (MSE)
<br />SF
<br />4820
<br />$35.00
<br />$168,700.00
<br />$54.00
<br />$260,280.00
<br />$48.00
<br />$231,360.00
<br />38425-2016
<br />PRESTR CONC SLAB BEAM 4SB15
<br />LF
<br />326.92
<br />$105.00
<br />$34,326.60
<br />$163.00
<br />$53,287.96
<br />$126.00
<br />$41,191.92
<br />39425-2017
<br />PRESTR CONC SLAB BEAM 5SB15
<br />LF
<br />5884.6
<br />$105.00
<br />$617,883.00
<br />$146.00
<br />$859,151.60
<br />$126.00
<br />$741,459.60
<br />40428-2002
<br />CONC SURF TREAT CLASS II
<br />SY
<br />3483
<br />$3.00
<br />$10,449.00
<br />$3.25
<br />$11,319.75
<br />$2.50
<br />$8
<br />41
<br />432 -2002
<br />RIPRAP CONC 5IN
<br />CY
<br />14
<br />$400.00
<br />$5,600.00
<br />$355.00
<br />$4,970.00
<br />$275.00
<br />$3,850.00
<br />42432-2040
<br />RIPRAP MOW STRIP )(5 IN
<br />CY
<br />15
<br />$420.00
<br />$6,300.00
<br />$395.00
<br />$5,925.00
<br />$300.00
<br />$4,500.00
<br />43.450-2071
<br />RAIL TY C402
<br />LF
<br />688
<br />$100.00
<br />$68,800.00
<br />$71.00
<br />$48,848.00
<br />$93.00
<br />$63,984.00
<br />44450-2077
<br />RAIL HANDRAIL TY F
<br />LF
<br />680
<br />$80.00
<br />$54,400.00
<br />$84.00
<br />$57,120.00
<br />$82.00
<br />$55,760.00
<br />45454-2005
<br />ARMOR JOINT WITH SEAL
<br />LF
<br />322.2
<br />$70.00
<br />$22,554.00
<br />$50.00
<br />$16,110.00
<br />$50.00
<br />$16,110.00
<br />46462-2019
<br />CONC BOX CULV 8 FT X 4 FT
<br />LF
<br />228
<br />$300.00
<br />$68,400.00
<br />$250.00
<br />$57,000.00
<br />$291.00
<br />$66,348.00
<br />47464-2003
<br />RC PIPE CL III 18 IN
<br />LF
<br />1765
<br />$30.00
<br />$52,950.00
<br />$23.00
<br />$40,595.00
<br />$25.00
<br />$44,125.00
<br />48464-2
<br />RC PIPE CL 111 24 IN
<br />LF
<br />1824
<br />$30.001
<br />$54,720.00
<br />$30.00
<br />$54,720.00
<br />$32.00
<br />$58,368.00
<br />49464-2007
<br />RC PIPE CL 111 30 IN
<br />LF 1
<br />1211
<br />$40.001
<br />$48,440.00
<br />$39.00
<br />$47,229.00
<br />$43.00
<br />$52,073.00
<br />•
<br />PAGE 6 OF 15
<br />i s 0
<br />
|