Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />31 <br /> <br />""':l, <br /> <br />I~I ORBY G. ROOTS <br /> <br />~ ARC HITECT <br /> <br />IlIi a, ~ I J m Iii <br /> <br />111-1 III <br /> <br />& . , i tti <br /> <br />1Ilil <br /> <br />area "II '11 <br /> <br />(. l" <br /> <br />'Dr HI <br /> <br />July 5, 1972 <br /> <br />Mr. Mark Gresham <br />City Manager <br />City of San Marcos <br />City Hall <br />San Marcos, Texas 78666 <br /> <br />Re: Park Development and Swimming Pool for <br />the City of San Marcos <br /> <br />Dear Mr. Gresham: <br /> <br />In accordance with our telephone conversation of July 3, 1972, we <br />are pleased to present this Proposal for professional services on <br />the development of the proposed new City Park and Swimming Pool. <br />We propose to provide basic services as set forth on Page 2 and 3 <br />of the attached booklet "Services of the Architect" as published <br />by the Texas Society of Architects. These Basic Services include: <br /> <br />1) Preparation of Schematic Design studies illustrating the <br />scope of the project. <br />2) From the approved Schematic Design studies, prepare Design <br />Development Documents consisting of drawings and outline <br />specifications as required to establish the size and character <br />of the project including structural, mechanical and electrical <br />systems, materials, landscaping layout, and such other essentials <br />as are appropriate. <br />3) From approved Des ign Development documents, prepare the complete <br />working drawings and specifications describing the work to be <br />done in detail to complete the project. <br />4) Assist in securing bids or negotiated proposals for construction <br />based upon construction documents. <br />5) Provide administration of construction contract. This would <br />include making periodic visits to the site to see that work is <br />proceeding in accordance with contract documents. <br /> <br />We propose to furnish the above service, listed in more detail below, <br />for a fee of 8.5% of the cost of construction. <br /> <br />The above basic services are intended to cover the overall development <br />of the approximate 19-acre park site on the San Marcos River, inCluding: <br /> <br />m . m . ..r: <br /> <br />{?:>f:' ,if' <br />" IG-/(rd-. <br />I' . t c <br /> <br /> <br />lb. <br /> <br />. f <br /> <br />11II. riD. J <br /> <br />i I 11 it It' <br /> <br />j r I: h <br />