Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />Honorable Mayor and City Commissioners, City of San Marcos, Texas, <br />March 7, 1955, Page.2. <br /> <br />forth herein shal I consist of setting the necessary construction stakes for <br />the contractor, periodical visits of the Engineer, or his representative, <br />to the job, and the checking of estim~tes submitted by the contr~ctor for <br />p~yment. Should resident supervision be required on the work, the actual <br />payrol I cost of such supervision shal I be in addition to the basic fee as <br />indicated below; the supervisor and his salary sholl be subject to your ~p- <br />prova I . <br /> <br />We wi 1 I furnish the personnel, equipment and materials, and perform the above <br />services on projects costing over $25,000.00 for the fol lowing fees. The to- <br />tal fee, b~sed on the Texas Society of Professional Engineers' fee schedule, <br />for ~ II the serv ices enumerat.ed lllbove will be a percentage of the tot~ I cost <br />of the project and will vary with that cost as fo II ows: <br /> <br />Cost of Construction <br />$ 25,000 to $ 50,000 <br />$ 50,000 to $100,000 <br />$100,000 to $250,000 <br />$250,000 to $500,000 <br />$500,000 to $750,000 <br /> <br />Tot~1 Basic Fee <br />7.5% <br />7.0% <br />6.5% <br />6.0% <br />5.5% <br /> <br />(Fee shall not be less than maximum calculated under the <br />next lower cost bracket.) <br /> <br />The fee shal I be payable for the services rendered upon completion of the fol- <br />lowing steps, and in the fol lowing percentages of the basic fee: <br /> <br />Preliminary Investigations and Estimates <br />Detailed Plans and Specifications <br />General Supervision <br /> <br />15% <br />50% <br />...221 <br />100% <br /> <br />In consideration of the above agreement, consultation with me, as principal, <br />or with my Chief Engineer, when I am unavailable, and time is of the essence, <br />wi I I not be charged for as long as the demands are reasonable. It is Intended <br />that I shal I be available for prel iminary discussions of proposed projects in <br />order to outl ine the program of investigation and research and the type of in- <br />formation that the Counci I requires in their deliberations in order to reach <br />a dec I s ion. It is' intended that th i s serv i ce will make my adv ice ava i I ab I e <br />to the City in matters of an engineering nature, and at the same time permit <br />the City to issue instructions to me as to those things of an engineering na- <br />ture on which information is desired in order the the City may make a decision. <br /> <br />Respectfully submitted, <br /> <br />FTD: fb <br /> <br />-/ ~ / < <br />/yczr-~ L--j) <br />FRANK T. DROUGHT <br /> <br />FRANK T.DROUGHT <br /> <br />P,O,BOX 8147 <br /> <br />SAN ANTONIO 12, TEXAS <br /> <br />CONSULTING ENGINEER <br /> <br />LICENSED LAND SUR.VEYOR <br />