Laserfiche WebLink
<br /> <br />C~t~ <br /> <br />LICENSED LAND SURVEYOR <br /> <br />P~r.hing 4-4296 <br />A &- E BUILDING <br />SAN PEDRO AT WOODLAWN <br />P. O. BOX 81.47 <br />SAN ANTONIO 12, TEXAS <br /> <br />~1arch 7, 1955 <br /> <br />Honorable Mayor and City Commissioners <br />City of San Marcos <br />San Marcos, Texas <br /> <br />Gentlemen: <br /> <br />In accordance with your request, I am submitting herewith a proposal <br />to perform engineering servi~es for the City of San Marcos on the <br />various projects that are no~ contemplated or may be contemplated in <br />the future. This proposal is also intended to cover any projects, <br />or intended projects, on which investigations, estimates, feasibi I ity <br />reports, and other engineering services are desired. <br /> <br />On smal I projects on which the City performs the construction work, <br />or the cost of which. is below $25,000.00, We wi I I furnish the engi- <br />neering services necessary to complete the construction of the pro- <br />ject and wi I I furnish field personnel and supervision, when desired, <br />during construction of the project on the basIs of our payrol I cost <br />multiplied by two. This fee wi I I cover al I incidental expenses, <br />such as per diem, transportation, stakes, and other items, and we <br />wi I I submit an itemized time summary showing the number of hours <br />worked by each i nd i v i dua I in each category and the I r pay rate the <br />last of each month at which time payment wil I be due. <br /> <br />This same arrangement wi I I apply to the preparation of estimates, re- <br />ports, feasibi I ity studies, and other work of a prel iminary nature. <br />However, should the project on which this prel iminary work has been <br />done be constructed, the City wi I I be given a credit toward the fee <br />for the working drawings and specifications of al I amounts paid for <br />the prel iminary work on the portion of the project constructed. On <br />projects to be financed through the issuance of bonds, fees for pre- <br />liminary work wi I I not be due before the date of the bond election <br />unless previous arrangements have been made with the City for payment. <br /> <br />When the construction of a project costing in excess of $25,000.00 <br />has been authorized, We wi II furnish the engineering services neces- <br />sary to prepare the'plans and specifications, receive bids, assist <br />in the letting of contracts for construction, and perform the gen- <br />eral supervision of the construction. General supervision as set <br /> <br />~ <br />