Laserfiche WebLink
<br />I FRANK T. OROOOHT <br /> CONSULTING ENG INfER <br />Periodical Estimate No. 4 <br />Pro,j.."t. Two Fire stat~an Marco" Texas "heat No 3 of 3 <br />lteJ Comb i nad Final <br /> Total Estimated nnst if. r.oonlete Tntal r.o t to nata Cost Total <br />No I nescrintion -Inb A Jnb'Fl Job A Job B lob A ob A Tn Date Co"t <br />39 ' Grave I nuard t 10'\ 00 t 10'\ 00 100 100 t 10" 0 It 105 00 t 210.0rlt 210 00 <br />40 Sheetrock 79" 00 79'i 00 100 100 795 0 79" 00 1"90 0 I "9000 <br />41 Lumber 2,'\<;000 2,<;<;0 00 100 100 2'3'30 0 25'i0 00 "10000 <; 100 00 <br />42 Steel Windnws 600 00 600 00 100 100 600 0 600 00 1200 00 1 200 00 <br />43 Doors 649 00 649 00 100 100 649 0 649 00 1298 00 298 00 <br />44 13u'frlers Risk nsurance 90 00 9000 100 00 90 0 qo 00 IRO 00 /80 00 <br />45 Bond 2"000 2<i0 00 100 100 250 0 2"0 00 'i00 00 GOO 00 <br /> Overhead not 1 isted <br />46 elsewhere I 415.6B 415.68 75 75 311 2 311 2" 622 "0 831 36 I <br /> t2<;, f>f>4 '12 i t24.8"3<; I';R $19,518.7( $24,382. 6 $43,901.4 It <;0 "00 00 <br /> Job A: 8ug Lane <br /> Job B: Academy Street <br /> <br />- <br /> <br />.. <br /> <br />- <br />