Laserfiche WebLink
<br />~ <br />" <br />M' <br />~ <br /> <br />I - <br /> FRANK T. DROUGHT <br /> 5 -Final CONSULTING ENGINEER <br />Pariodical Estimate No. <br />Pro,l",rt. Two Fire Stat~an Marcos Texas Sheet Nn, 3 of 3 <br />lteJ <t. C"unlete Total Co, t to Date Comb i ned Final <br /> Total Estimated Cost Cost Total <br />No I Descrintion .lob A Job B .lob A 'ob B 'ob A .Inb R To nate Cost <br />39 Gravel C1uard < 105.00 t 105 00 100 100 < 105.00 It 105.00 t 210.00 It 210 00 <br />40 Sheetrock 79~. 00 79~ 00 100 100 795.00 795.00 I ~90 00 I ~90 00 <br />41 Lumber 2.550 00 2<;<;0 00 100 100 2 550.00 2 550.00 5 100.00 ~.IOO 00 <br />42 Steel Windows 600 00 600 00 100 100 600.00 600.00 I 200.00 I 200 00 <br />43 I Doors 649 00 649 00 100 100 649.00 649.00 I 298.00 I 298 00 <br />44 B" ltiers Ri sk nsurance 9000 90 00 100 100 90.00 90,00 180.00 180 00 <br />4~ Bond 250 00 250 00 100 100 250.00 250.00 500.00 <;00 00 <br /> Overhead not listed <br />46 elsewhere 415.68 415.68 100 lOa , 415.68 415,68 831.36 831 36 <br /> 12~ 664..32 ,124 835 68 100 100 25,664.32 24,835.68 50,500.00 t~O<;OO 00 <br /> Job A: Bug Lane <br /> Job B: Academy 5treet <br /> <br />I. <br /> <br />~ <br /> <br />-~ <br />