My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08111959 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1950 s
>
1959
>
08111959 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2008 8:56:52 AM
Creation date
6/23/2008 11:07:23 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
8/11/1959
Volume Book
23
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J <br /> <br />II <br /> <br />I <br /> <br />compensation based on the following amounts and rates for such profess- <br />ional engineering services. <br />A. Upon completion of the Preliminary Phase the Engineer shall be <br />reimbursed with the cost of the work actually done, but in no event to <br />exceed a sum equal to $600. <br />B. The Design Phase. The Engineer shall be entitled to compensation <br />for the work actually done, but in no event to exceed the amount of <br />$2000.00, i.cluding the $600.00 for the Preliminary Phase as above. <br />C. COnstruction Phase. At the completion Qf the eonstruction Phase <br />the Engineer shall be entitled to $750.00, ~kin9 a total maximum engineer- <br />ing cost for the completed facility of $2750.00. <br /> <br />V. <br /> <br />After the completion of the Preliminary Phase of this contract, the <br />City, at option, may terminate this contract at any time; and in the event <br />of such termination, the Engineer not being in default, the Engineer shall <br />be paid a sum of money which bears the same proportion to the total fee <br />provided for in this contract as the work actually performed .at the time <br />of termination bears to the total work to be performed hereunder. <br />Upon the termination of the contract, all plans, specifications, <br />drawings, estimates, reports, and other related working materials, comple- <br />ted, or work in progress, for which the Engineer has been paid by the <br />City, shall become and remain the property of the City. <br />The City agrees to pay for all work performed under this contract <br />within thirty days of the date of presentation to City of a proper invoice <br />from the Engineer, all payments hereunder to be made at the City Hall in <br />San Marcos, Hays County, Texas, the place here fixed forperfoxmance of <br />this contract. <br /> <br />VI. <br />The Engineer Shall deliver to the City for the City's use five com- <br />plete sets of prints, drawings, or the copies of all drawings, specifi- <br />cations, and contract documents, in addition, the Engineer shall furnish <br />
The URL can be used to link to this page
Your browser does not support the video tag.