Laserfiche WebLink
<br />J <br /> <br />II <br /> <br />I <br /> <br />compensation based on the following amounts and rates for such profess- <br />ional engineering services. <br />A. Upon completion of the Preliminary Phase the Engineer shall be <br />reimbursed with the cost of the work actually done, but in no event to <br />exceed a sum equal to $600. <br />B. The Design Phase. The Engineer shall be entitled to compensation <br />for the work actually done, but in no event to exceed the amount of <br />$2000.00, i.cluding the $600.00 for the Preliminary Phase as above. <br />C. COnstruction Phase. At the completion Qf the eonstruction Phase <br />the Engineer shall be entitled to $750.00, ~kin9 a total maximum engineer- <br />ing cost for the completed facility of $2750.00. <br /> <br />V. <br /> <br />After the completion of the Preliminary Phase of this contract, the <br />City, at option, may terminate this contract at any time; and in the event <br />of such termination, the Engineer not being in default, the Engineer shall <br />be paid a sum of money which bears the same proportion to the total fee <br />provided for in this contract as the work actually performed .at the time <br />of termination bears to the total work to be performed hereunder. <br />Upon the termination of the contract, all plans, specifications, <br />drawings, estimates, reports, and other related working materials, comple- <br />ted, or work in progress, for which the Engineer has been paid by the <br />City, shall become and remain the property of the City. <br />The City agrees to pay for all work performed under this contract <br />within thirty days of the date of presentation to City of a proper invoice <br />from the Engineer, all payments hereunder to be made at the City Hall in <br />San Marcos, Hays County, Texas, the place here fixed forperfoxmance of <br />this contract. <br /> <br />VI. <br />The Engineer Shall deliver to the City for the City's use five com- <br />plete sets of prints, drawings, or the copies of all drawings, specifi- <br />cations, and contract documents, in addition, the Engineer shall furnish <br />