My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03131962 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1960 s
>
1962
>
03131962 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2008 9:53:13 AM
Creation date
6/23/2008 11:07:47 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
3/13/1962
Volume Book
24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />NOTE: <br /> <br />THIS FORM TO REPLACE ANi) VOID THE ORIGINAL FIRST SHEET OF THE FORM OF PROPOSAL <br />ADDENDUM No. 1 <br /> <br />. <br />II <br /> <br />{: <br /> <br />City of San Marcos,Texas <br />Sewage li ft Stat i on Reconstruct i on <br />as requ j re,d for <br />Water and Sewer Uti i ities Reiocation and Adjustments <br />Texas Highway Department R.O,W. Project No.1 35-3(26)204 <br /> <br />FORM OF PROPOSAL <br /> <br />San Marcos, Texas <br />Date: March 9...1962 <br /> <br />I <br /> <br />Proposa I of NORMAN HARWELL _ (here i n.af ter ca! 1 el;( <br />II Bid der II ) acx::lOxplO!OOltXIlllX,X]llX~ZlEIl::l!lmdxlllIiJEltxIllQi:XlIIlIlI(IlCJdJJ!X liatioJSxlllil:JdJJ!~XGI'f <br />Texas, a ~IltSbii.llX\Ilm6li::sxilOQlUl!i ... <br />and an individual trading as HRrwell & HRI'well <br />To the City of San Marcos, Texas <br /> <br />Qentlemen: <br /> <br />The bidder, in compliance with your invitation for bids for the relocated construction <br />ofa sewage lift station, having exarr;ined the plans and specifications with/related <br />documents and the site of the proposed work, and being familiar with all of the con- <br />ditionsurrounding the construction of the proposed project includif1g the availability <br />of materials and labor, hereby proposes to furnish all labor, materials, and,supplies, <br />and to construct the proj ect I n accordance wi th .the Contract Documents, wlthi nfhe <br />time set forth therein, and at the lump SJm price stated below. Theseprices <br />are to cover all expenses incurred in pe,forming the work required under the Contract <br />Documents, of which this proposal is a part. . <br /> <br />Bidder hereby agrees to commence work under this contract on.a date to be,specified <br />in'written "Work Order" of the engineer and to fully complete the project within <br />90 consecutive calendar days thereafter as stipulated in the speclficatloils; Bidder <br />further agrees to pay as 1 iqlJidated damages, the sum of $50.00 for each ,consecutfll.e.. <br />calendar day thereafter, . <br /> <br />I <br /> <br />Bidder acknowledges receipt of the following Addenda: <br />......AddElndum #1 Date: tic D47"" (3-~-(''t) <br />Addendum #2 Date: <br /> <br />BID PRICE: LUMP SUM <br />:2:;- ~ 0 <br /> <br /> <br />(Price in Figures <br /> <br />) <br /> <br />MA./~ <br /> <br />4./P~'O <br /> <br /> <br /> <br />~~1 hVE <br /> <br />-Dollars. <br /> <br />'13 A- i <br />
The URL can be used to link to this page
Your browser does not support the video tag.