My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12011965 Special Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1960 s
>
1965
>
12011965 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2008 1:51:55 PM
Creation date
6/23/2008 11:08:44 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
12/1/1965
Volume Book
31
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />\\,-1\ <br /> <br />interest thereon at the rate of six (6%) percent per annum from <br />the date due, as provided herein, until fully paid, which shall <br />fully liquidate any injury to the Engineer arising from such delay <br />in payment; but the right is expressly reserved to the Engineer in <br />event payments are not promptly made as provided herein, at any <br />time thereafter to treat the agreement as terminated by the Owner <br />and recover compensation as provided by Section IX of this agree- <br /> <br />ment. <br /> <br />SECTION VI - REVISIONS <br /> <br />The Engineer will make, without expense to the Owner, <br />such revisions of the preliminary drawings as may be required to <br />meet the needs of the Owner, but after a definite plan has been <br />approved by the Owner and if a decision is subsequently made by <br /> <br />the Owner, which for its proper execution, involves extra services <br />and expenses, or if the Engineer is put to labor or expense by <br />delays imposed on him from causes not within his control, the <br />Engineer shall be compensated for such extra services and expenses. <br />Compensation for such extra services shall be at salary cost plus <br />one hundred percent (100%), plus reimbursement for direct non-labor <br />expense and subcontract expense at invoice cost plus a ten percent <br /> <br />(10%) service charge. <br />SECTION VII - OWNERSHIP OF DOCUMENTS <br /> <br />All documents, including original drawings, estimates, <br />specifications, field notes and data are and remain the property <br />of the Engineer as instruments of service. The Owner may at his <br />expense retain reproducible copies of drawings, and copies of other <br />documents, in conside;:ation of which it is mutually agreed that the <br />~'::1J.;l.l-- <br />Owner will use them~. Je.lY/in connection with the improvements, and <br />ct1/ <br />not for the purpose of making subsequent extensions or enlargements <br />thereto, Save with the express consent of the Engineer. Re-use for <br />extensions of the original project, or for new projects, shall re- <br /> <br />- 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.