Laserfiche WebLink
<br />.' <br /> <br />,. <br /> <br />I <br /> <br />5.5 He shall arrange and pay for such legal, auditing, and <br />insurance counselling services as may be required for the <br /> <br />Proje:ct. <br /> <br />5.6 If the Owner observes or otherwise becomes aware of <br />any defect in the Project, he shall give prompt written notice <br />thereof to the Architect. <br /> <br />ARTICLE 6. PROJECT CONSTRUCTION COST <br /> <br />'J <br /> <br />6.1 Proj.ect Construction Cost as here.in referred to means <br />the total cost of all work designed or specified by the <br />Architect, but does not include any payments made to the <br />Architect or consultants. <br /> <br />6.2 Project Construction Cost shall be based upon one of <br />the following sources with precedence in the order listed: <br />6.2.1 Lowest acceptable bona fide Contractor's proposal <br />received for any or all portions of the Project. <br />6.2.2 Semi-Detailed or Detailed Estimate of Project Con- <br />struction Cost as defined in paragraph 6.4 below. <br />6.2.3 The Architect's latest Statement of Probable Project <br />Construction Cost based on current area, volume or other <br />unit costs. <br /> <br />6.3 When labor or material is furnished by the Owner, <br />the Project Construction Cost shall include such labor and <br />material at CUrrent market COst. <br /> <br />6.4 If a fixed limit of Project Construction Cost is stated <br />herein, or if otherwise authorized by the Owner, Estimates <br />of the Probable Project Construction Cost prepared in <br />Semi-Detailed or Detailed form by an experienced estimator <br />will be secured by the Architect during the Design Developw <br />ment or Construction Documents Phase. <br /> <br />6.5 If the Statement of Probable Project Construction <br />Cost, or the Semi-Detailed or Detailed Cost Estimate, or <br />the lowest bona fJde proposal is in excess of any limit stated <br />herein, the Owner shall give written approval of an increase <br />in the nmit, or he shall cooperate in revising the project <br />scope or quality, or both, to reduce the cost as required_ <br /> <br />6.6 Since the Architect has no control over the cost of <br />labor and materials, or competitive bidding, he does not <br />guarantee the accuracy of any Statements of Probable Con- <br />struction Cost, or any Semi-Detailed or Detailed Cost Esti- <br />mates. <br /> <br />ARTICLE 7. OIRECT & REIMJlURSABLE EXPENSE <br /> <br />. <br /> <br />7.1 Direct Personnel Expense includes that of principals <br />and employees engaged on the Project including architects, <br />engineers, designers, job captains, draftsmen, specification <br />writers, typists and Project Representatives, in consultation, <br />research, designing, producing draWing, specifications and <br />other documents pertaining to the Project, and services dur- <br />ing construction at the Project site. <br /> <br />7.2 Reimbursable Expense includes actual expenditures <br />made by the Architect in the interest of. the Project for the <br />following incidental expenses: <br />7.2.1 Expense of transportation and living of principals <br />and eID;ployees when traveling in connection with the Project; <br />long dIstance calls and telegrams; reproduction of draWings <br />and specifications, exclUding copies for Architect's office use <br />and dupHcate sets at each phase fDr the Owner's review and <br />approval; and fees paid for securing approval of authorities <br />having jurisdiction over the Project. <br /> <br />7.2.2 .If authorized in advance by the Owner, the expense <br />of Project Representative, overtime work requiring higher <br />than regular rates, perspecth'es or models for the Owner's <br />Use. <br /> <br />7.2.3 If their employment is authorized in advance by the <br />Owner~ fees of special consultants, for other than the normal <br />structural, mechanical and electrical engineering services. <br /> <br />ARTICLE 8. PAYMENTS TO THE ARCHITECT <br /> <br />8.1 Payments on account of the Architect's basic services <br />shan be as follows: <br /> <br />8.1.1 ~~ ...;111 ,.1 . t'~;u ': t'~J ' t [j r- ~v l f tl. <br />M l);'!R.1B.ti: L[ t':'1'_ v_ .1 ,.r~J ' I .l' ~ t nllu <br />i tla "~H2 lint, in tftl! IM- - R 'i.:lIRiRt "'if tJ;- <br />~ <br />8.1.2 ~Payments shall be made montWy in pro- <br />portion to services performed to increase the compensation <br />for basic services to the following percentages at the com~ <br />pletton of each phase of the work: <br />Schematic Design Phase 15% <br />Design Development Phase 35% <br />Construction Documents Phase 75% <br />Receipt of Bids 80% <br />Construction Phase 100% <br /> <br />8.2 Payments for Additional Services of the Architect as <br />defined in Article 4 above, and for Reimbursable Expense <br />as defined in Article 7.2, shaH be made monthly upon pres- <br />entation of Architect's detailed invoice. <br /> <br />8.3 No deduction shall be made from the Architect's com. <br />pensation on account of penalty, liquidated damages, or <br />other sums withheld from payments to contractors. <br /> <br />8,4 If any work designed or speCified by the Architect <br />during any phase of service is abandoned or suspended in <br />whole or in part, the. Architect is to be paid for the service <br />performed on account of it prior to receipt of written notice <br />from the Owner of such abandonment or suspension, togeth. <br />er with. l'eimbur:;ements then due and any terminal expense <br />resulting from abandonment Or suspension for more than <br />three months, <br /> <br />ARTICLE 9. ARCHITECT'S ACCOUNTING RECORDS <br /> <br />Records of the Architect's Direct Personnel, Consultant, and <br />Reimbursable Expense pertaining, to this Project and records <br />of accounts between the Owner and Contractor shall be kept <br />on a generally recognized accounting basis and shall be avail- <br />able to the Owner or bis authorized representative at mu- <br />tually convenient times. <br /> <br />ARTICLE 16. TERMINATION OF AGREEMENT <br /> <br />This Agreement may be terminated by either party upon <br />seven day's written notice should the other party fail sub- <br />stantially to perform in accordance with its terms through <br />no fault of the other. In the event of termination, due to <br />the fault of others than the Architect, the Architect shall be <br />paid for services performed to termination date, including <br />reimbursements then due! plus terminal expense. <br /> <br />ARTICLE 11. OWNERSIDP OF DOCUMENTS <br /> <br />Dnlwings and Specifications as instruments of service are <br />the property of the Architect whether the Project for which <br />they are made be executed 01' not. They are not to be used <br />on other projects except by agreement in writing. <br /> <br />ARTICLE 12. SUCCESSORS ANn ASSIGNS <br /> <br />The Owner and the Architect each binds himself, his part- <br />ners, successors, assigns and legal representatives to the other <br />party to this Agreement and to the partners, sUCcessors, <br />assigns and legal representatives of such other party in <br />respect of all covenants of this Agreement. Neither the <br />Owner nor the Architect shall assign, sublet or transfer his <br />interesl in this Agreement without the written consent of <br />the other_ <br /> <br />ARTICLE 13. ARJlITRATION <br /> <br />Arbitration of all questions in dispute under this Agreement <br />shall be at the choice of either party and shall be in accord~ <br />ance with the provisions, then obtaining, of the Standard <br />Form of Arbitration Procedure of The American Institute <br />of Architects. This Agreement shall be specifically enforcew <br />able under the prevailing arbitration law and judgment <br />upon the award rendered may be entered in the court of <br />the forum, state or federal, having jurisdiction. The de- <br />cisions of the arbitrators shaU be a condition precedent to <br />the right of any legal action. <br /> <br />OWNER-ARCHITECT AGREEMENT <br /> <br />FOUR PAGES <br />PAGE 3 <br /> <br />ALA DOC. B-131 <br /> <br />SEPT. 1963 ED. <br />