My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01301967 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1960 s
>
1967
>
01301967 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2008 3:42:49 PM
Creation date
6/23/2008 11:09:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
1/13/1967
Volume Book
33
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />'" <br /> <br />ISOM H. h,'~;_':::' 3: ASSOCIATES <br />ENGINEERS <br /> <br />PAGE _~_ <br /> <br />The cost of actually preparing for construction of improve- <br />ments to existing streets is sometimes as much as the cost of <br />curbs and gutters, base materials, and asphalt surface. Upper <br />Guadalupe has been in this catagory. Your agency in the last <br />few months has worked with the Gas Company, the City of San <br />Marcos on water and sanitary sewers, and the electric and tele- <br />phone companies, to coordinate the changes and alterations on <br />these utilities on upper Guadalupe and other streets. Working <br />out all these matters has been no small job. The plans of the <br />College at the high-rise dormitory include multiple improvements <br />next to and near the curb in the subject area. Moving the curb <br />on that side of Guadalupe involves new meetings with the College <br />and their architect and will involve change-orders with their <br />contractor. We cannot furnish cost estimates to you in regard <br />to such preparation matters as the utility adjustments and ad- <br />justments to College construction. The following tabulation will <br />assist you and the City in completing cost estimate for the street. <br />The construction costs shown are based upon prices now in effect <br />with your contractor, Austin Paving Company, on the Chautauqua <br />Hill Project. <br /> <br /> A. Demolition and Earthwork @ Lump Sum $ 2,500.00 <br />I B. 1,110 Lin. Ft. , Cone. Curb & Gutter <br /> @ $1.20 1,332.00 <br /> C. 620 S. Y . , Asph. Surface & Flex. Base <br /> @ $1. 56 967.20 <br /> D. 186 C. Y . , Base Material @ $0.60 (Recent <br /> Price increase in base material) 111. 60 <br /> Sub-Total, Construction $ 4,910.80 <br /> 10% Engineering & Supervision 491.08 <br /> Sub-Total, Actual Construction $ 5,401,88 <br /> E. Stop & Change Order Costs to <br /> URA Contractor ? <br /> F. Administrative Costs to <br /> URA (local, Ft. Worth, etc.) ? <br /> G. Adjustment to City <br /> Utilities (Water & San. Sewers) ? <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.