Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />a. Provide without cost to the United States all lands, <br /> <br />easements, and rights-of-way and spoil disposal areas necessary for <br />construction, maintenance, and operation of the project. <br /> <br />b. Provide without cost to the United States all relocations <br /> <br /> <br />and alterations of bridges, except railroad bridges, and all buildings, <br /> <br /> <br />structures, pipelines, sewers, utilities, and any other alterations <br /> <br /> <br />of existing structures or improvements which may be required for <br /> <br /> <br />construction of the project. <br /> <br /> <br />c. Hold and save the United States free from damages due to <br /> <br /> <br />construction of the project. <br /> <br /> <br />d. Prevent any encroachment on the flood carrying capacities <br /> <br /> <br />of the improved channel. <br /> <br /> <br />e. Maintain and operate all works after completion in <br /> <br /> <br />accordance with regulations prescribed by the Secretary of the Army. <br /> <br /> <br />f. At least annually} publicize and notify all interested <br /> <br /> <br />parties that the project will provide protection from the occurrence <br /> <br /> <br />of a lOO-year flood, but will not provide complete protection <br /> <br /> <br />against larger floods. <br /> <br />Sincerely yours, <br /> <br />Mayor of San Marcos <br />