Laserfiche WebLink
objectives, and policies, and in coordination with the element <br />liaison from city staff. <br /> <br />The preparation of a reproducible color map indicating the pre- <br />liminary desired future land use at a scale of 1"=4000' <br /> <br />Central Business District Plan <br /> <br />A. A review of the existing studies of the central business dis- <br /> trict (CBD) by Texas A & M University and the urban renewal <br /> plan. <br /> <br />B. An analysis of the existing development trends in the CBD <br /> versus the 1977 proposals. <br /> <br />C. A sketch map of the proposed CBD plan at a scale of l"=lO00' <br /> with recommendations for modification. <br /> <br />D. The development of goals, objectives, policies, and imple- <br /> mentation strategies in coordination with the element liaison <br /> to realize the planning proposals. <br /> <br />VI. <br /> <br />Housing Plan <br /> <br />A. An analysis of the condition of the existing housing stock <br /> <br /> by planning sector and a tabulation of those characteristics.. <br /> <br />B. A map at a scale of 1"=4000' showing concentrations of blighted <br /> housing. <br /> <br />C. An overview of current efforts to provide housing for low and <br /> moderate income families. <br /> <br />D. An assessment of the need for low and moderate income housing. <br /> <br />E. The development Of goals, objectives, policies, and imple- <br /> mentation strategies in coordination with the element liaison <br /> <br /> <br />