Laserfiche WebLink
D. PCM 05 - Realignment near the St. John's Church to avoid a new parking lot <br />Bid Item 23 5 LF $250 $1,250.00 0 <br /> Subtotal $1,250.00 0 <br />E. PCM 06 - Realignment near the Texas State Baseball field to avoid berm. <br />Bid Item 22 7.5 LF $195 $1,462.50 <br />Bid Item 26 (1) EA $9,000 ($9,000.00) 0 <br />Bid Item 27 (16) VF $150 ($2,400.00) <br /> Subtotal ($9,937.50) 0 <br />F. PCM 07 - Added tree trimming near Riverside Drive. <br />Tree Trimming 1 LS $3,033 $3,033.00 0 <br /> Subtotal $3,033.00 0 <br />G. PCM 08 - Added stub-out at manhole 24 per Texas State request . <br />Bid Item 18 35 LF $130 $4,550.00 <br />Core and connect 0 <br />1 LS <br />to Manhole $2,025 $2,025.00 <br /> Subtotal $6,575.00 0 <br />H. RFI 02 - Additional encasement to avoid existing fiber optic line s in the rai lroad right of way . <br />Bid Item 29 10 LF $475 $4,750.00 0 <br /> Subtotal $4,750.00 0 <br />1. Directed By OWNER - Additional rock berms for silt control. <br />Bid Item 12 117 LF $30 $3,510.00 0 <br /> Subtotal $3,510.00 0 <br />Total Amount: $263,638.30 15 <br />Previous contract amount: <br />Net increase/decrease in contract amount: <br />Revised contract amount: <br />Previous contract time of completion (substantial/final) <br />Net increase/decrease in contract time of completion <br />Revised contract time of completion (substantial/final) <br />$ 5,086,496.05 <br />$ 381,638.30 <br />$ 5,468,134.35 <br />330 / 390 days <br />15/ 15 days <br />330 / 390 days <br />Signature page is attached.