Laserfiche WebLink
<br />.7fu.Q!J 0/ Suv11arcos <br /> <br />127a <br /> <br />OFFICE MEMORANDUM <br /> <br />TO: Ray Kotowski, Director of Public Works <br /> <br />Fill Leon Barba, City Engineer <br /> <br /> <br />SUBJECT: Replacement of 2" Water Line <br /> <br />DATE: <br /> <br />April 12, 1978 <br /> <br />RE: Westover Area Water and Sewer <br />Improvements <br /> <br />The City maps and construction plans indicate that a 6" water <br />line is located in the intersection of Burleson Street and Gillett <br />Street. The proposed improvements were to have been tied in <br />at this location. However, the existing 6" water line is approx- <br />imately 375 feet from the proposed tie-in. An ~xisting, shallow <br />2" water line presently serves this area. <br /> <br />George Boeker <br />tied into the <br />be abandoned. <br />ment: <br /> <br />and I recommend that the proposed improvements b,~ <br />existing 6" line. Th~ existing 2" line will then <br />FOllowing is an approximate cost of the replace,- <br /> <br />257 L.F. <br /> <br />811 AC @ $15.27/L.F. <br /> <br />$3,924.39 <br /> <br />,I <br /> <br />117 L.F. - 6" DI @$17.83/L.F. $2,086.11 <br /> <br />2 Water services @ $200.00/ea. (approx.)= $ 400.00 <br /> <br />Base - 145 S.Y. @ $2.88/S.Y. = <br /> <br />$ 417.60 <br />$ 536.50 <br />$7~364.60 <br /> <br />paving - 145 S.Y. @ $3.70/S.Y. <br /> <br />TOTAL <br /> <br />Also, please be advised that Change Order #1 will decrease the <br />contract price by $5,384.24. Therefore, the total increase in <br />contract price will be approximately $1,980.36. <br /> <br />Please let me know your decision concerning this matter. <br /> <br />Sincerely, <br />,Ii () 0 r7{- <br />"'Fr., sU>-v---, rs)(L v I:.e~ J \. . <br /> <br />Leon Barba, P.E. <br />City Engineer <br /> <br />, <br /> <br />cc: ~~ J. Webster, City Manager <br />Albert Sierra, Community Development Director <br />