My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1978-073
San-Marcos
>
City Clerk
>
03 Resolutions
>
1970 s
>
1978
>
Res 1978-073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2008 2:28:08 PM
Creation date
8/19/2008 2:28:08 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1978-73
Date
10/23/1978
Volume Book
49
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(4) Impacts. No major adverse social or environ- <br />mental impacts are anticipated as a result of <br />the construction of sewer lines in San Marcos. <br /> <br />e. Segment 1810 <br /> <br />(1) Town of Kyle. <br /> <br />I <br /> <br />(a) Structural Requirements. One additional <br />trunkline is proposed for Kyle in the 1990 <br />subplan. No treatment additions are pro- <br />posed contingent upon the acceptance of a <br />higher TSS value in the permi t by the De-' <br />partment of Water Resources. <br /> <br />(b) Management Requirements. The Town of Kyle <br />as the designated management agency will <br />continue to own, operate and maintain the <br />sewerage system in Kyle. <br /> <br />(c) Costs. The r.ost of the oroposed trunk- <br />line addition 1S S96.noO iJ", '978 dollals. <br /> <br />(d) Impacts. No major adverse social or envi- <br />ronmental impacts are expected as a result <br />of the construction of the trunkline in Kyle. <br /> <br />(e) Water Rights. The projected wastewater dis- <br />charge from the Kyle plant in 1990 is 0.319 <br />11GD. <br /> <br />(2) City of Lockhart <br /> <br />(al Structural Requirements. Additional trunk- <br />lines will be needed in Luling to serve the <br />projected population in 1990. No new treat- <br />ment facilities will be needed at that time. <br /> <br />I <br /> <br />(b) Hanagement Requirements. The City of Luling <br />is the designated management agency to con- <br />tinue to own, operate and maintain the sewerage <br />system in LUling. <br /> <br />(c) Cost. The expected cost for the construction <br />of the additional trunklines in Luling is <br />$33,000 in 1978. <br /> <br />(d) Impacts. No major adverse social or environ- <br />mental impacts are expected as a result of <br />the construction additional trunklines in <br />Luling. <br /> <br />(e) Water Rights. The projected total waste- <br />water discharge from the two LUling treat- <br />ment plants is 1.329 MGD in the year 2000. <br /> <br />II-C-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.