Laserfiche WebLink
<br />162k <br /> <br />exhibit a continued <br /> <br />Page 2,of 2 <br /> <br />METERING <br /> <br />All energy consUll1ed lUlder this schedule shall be metered excepting installa- <br />tions where, in the opinion of Distributor, metering would be impracticable. <br /> <br />I <br /> <br />When the consumption is metered, the meters shall be installed in or <br />connected to the lighting circuit and the billing shall include the energy <br />delivered to and cOIlsUll1ed in all circuits and equipment used exclusively for street <br />lighting purposes. If more than one meter is used, the readings shall be <br />consolidated for billing purposes. <br /> <br />When the energy is not metered and also when a meter is found to be in <br />error, the consumption for billing purposes shall be computed from the rated <br />capaci ty of the lamps pwus 5% for losses, multiplied by the number of hours of <br />use. <br /> <br />PAYMENT <br /> <br />The rates included herein are net, the gross rates being ten per cent <br />(10%) higher. In the event the current monthly bill is not paid within ten (10) <br />days from date of bill, the gross rates shall apply. <br /> <br />. <br /> <br />J <br />