My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1977-037
San-Marcos
>
City Clerk
>
03 Resolutions
>
1970 s
>
1977
>
Res 1977-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2008 11:57:12 AM
Creation date
8/20/2008 11:57:12 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1977-37
Date
7/25/1977
Volume Book
47
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />Salary Cost shall be obtained by multiplying actual salaries times 1.24. <br />4.1.3 VVte.u Non-Labolt EXpe.Me. is defined as all non-labor <br />expenses incurred by the Engineer which are directly chargeable to the <br />PROJECT, which in general include expenses for supplies, transportation, <br />equipment, travel, communications, subsistence and lodging away from <br />home, field office expenses, reproduction, and similar inc,identals. <br />4.1.4 PtUnupcU'., where used in the Agreement, is understood to <br />apply only to Mr. Roy W. Porter, Managing Partner of the association, <br />and Mr. James E. Byrn. Mr. James E. Byrn may render services required <br />in Article 3, other than as a Principal, and shall receive payment as <br />outlined in Section 4.4.3. <br />4.2 PAYMENT FOR BASIC SERVICES PHASES 1,2, AND 3 <br />4.2.1 The. Ba.6~c Chaltge. (Basic Fee) of the ENGINEER shall be <br />expressed as a pe.ltce.nt 06 the. COM~~on Co~t of each individual item <br />of work authorized by the OWNER. The Basic Charge, in percent, will <br />cover Phase 1, Phase 2, and Phase 3 services described in Article 2. The <br />following allocation of the Basic Charge shall apply: <br />Phases 1 and 2 - Preliminary Engineering <br />and Final Design 85 percent <br />Phase 3 - Administration of the <br />Contract - Construction <br />Phase 15 percent <br />TOTAL BASIC CHARGE 100 percent <br />4.2.2 Vcte.ltm~na.tion 06 Ba.6~C Chaitge.. The Ba.6~c Cha.itge. shall <br />be determined from CWtue. "An of the General Engineering Services Manual <br />published jointly by the Consulting Engineers Council of Texas and the <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.