My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 1977-037
San-Marcos
>
City Clerk
>
03 Resolutions
>
1970 s
>
1977
>
Res 1977-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2008 11:57:12 AM
Creation date
8/20/2008 11:57:12 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
1977-37
Date
7/25/1977
Volume Book
47
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />,-----'- <br /> <br />,~ <br /> <br />4.3 PAYMENT FOR PHASE 4 SERVICES <br /> <br />4.3.1 Pa!fl1leYI-t nOIL Ph<ue 4 SVtv.tCeA will be computed on the basis <br /> <br />of oatalLy COot times a multiplier plus d.tJtect non-laboIL expenoe. The <br />billing period for Phase 4 services will be calendar months. <br />4.3.2 FOIL the oVtv.tCeA On peJthonnei to act as th~ Resident Proj- <br />ect Representative and other personnel utilized, in providing Phase 4 <br />services, the ENGINEER will be compensated at his oat~y COot times a <br />multiplier of 2.0. <br /> <br />4.3.3 V.tJtect non-iaboIL expenoe shall be reimbursable at actual <br />invoice cost plus ten percent (10%). <br /> <br />4.4 PAYMENT FOR SPECIAL SERVICES <br /> <br />4.4.1 Scope. Under this Article, if the OWNER ~lects to have <br />the ENGINEER furnish Special SVtv.tceo as set forth in Article 3, payment <br /> <br />for such services will be made as set forth herein. The billing period <br /> <br />for all Special SVtv.tceo will be calendar months. As set forth in Arti- <br /> <br />cle 3, the Special SVtv.tCeA have been divided into Group 1 and Group 2. <br /> <br />4.4.2 <br /> <br />PaymeYI-t naIL Special SVtv.tCeA, GILOUp 1. ~ f the OWNER <br /> <br />elects to have the ENGINEER furnish services of a field survey crew for <br />any Special SVtv.tce, under Group 1, the ENGINEER will be compensated for <br />hours actually required at an hourly rate of $32.50 pe~ hour for a crew <br />consisting of three (3) men and an hourly rate of $40.00 per hour for a <br />crew consisting of four (4) men. The ENGINEER will be 'reimbursed for <br />d.tJtect non-laboIL expenoeA at his actual invoice cost plus ten percent <br />I <br /> <br />(10%) . <br />4.4.3 <br /> <br />Pa!fl1leYI-t nM Special SVtv.i.CeA, GILOUp 2. I f the OWNER <br /> <br />elects to have the ENGINEER furnish services of personnel, other than <br /> <br />-15- <br />
The URL can be used to link to this page
Your browser does not support the video tag.